My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Item <br />gy_ <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: November 18, 2021 <br />To: Jason E. Brown, County Administra or <br />From: Matthew Jordan, Interim Director of Utility Services <br />Prepared By: Terry Southard, Operations Manager <br />Subject: North County Reverse Osmosis Water Treatment Plant Supervisory Control and Data <br />Acquisition System Upgrades, Kimley-Horn Work Order No. 7 <br />Background: <br />On May 19, 2020, the Indian River County (IRC) Board of County Commissioners (BCC) approved Work <br />Order No. 2 with Kimley-Horn and Associates, Inc., (KHA) to provide professional services for assessment, <br />remediation, and bidding services for upgrades to the Supervisory Control and Data Acquisition (SCADA) <br />system at the North County Reverse Osmosis (NCRO) water treatment plant (WTP). <br />Their work resulted in recommending the replacement of the SCADA system. Staff is currently preparing <br />documents to go out to bid for the replacement of the SCADA system at NCRO. <br />Analysis: <br />Since KHA is already very familiar with the SCADA system and had recommended replacement, staff asked <br />KHA to provide an estimate for professional services to include construction phase service as well as <br />integration labor that will be required to program each of the upgrades to the program logic controllers, <br />remote input/output panels and various other components of the SCADA system. <br />KHA provided Work Order No. 7, which is in accorcance with the Agreement for Professional Services for <br />Water Plant and Water Resources Engineering Services -Request for Quote (RFQ) 2019070 dated <br />November 5, 2019. <br />Funding: <br />Funding in the amount of $255,219 is available in the Utilities/Water Production/WTF SCADA system <br />updates account, number 47121936-044699-19536. Utilities operating funds are derived from water and <br />sewer sales. <br />Description <br />Account Number <br />Amount <br />Utilities/Water Production/WTF SCADA System <br />47121936-044699-19536 <br />$255,219.00 <br />Updates <br />215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.