My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #1 <br />Supervisory Control and Data Acquisition (SCADA) System Upgrades <br />at Hobart Water Treatment Plant <br />PROJECT UNDERSTANDING <br />Kimley-Horn recently completed the final design for the Hobart (North) Water <br />Treatment Plant (WTP) SCADA/PLC system improvements. <br />Under Work Order No. 2, Indian River County Utilities Department retained the <br />services of Kimley-Horn to complete design for improvements to the Hobart <br />(North) Water Treatment Plant Supervisory Control and Data Acquisition <br />(SCADA) and Programmable Logic Controllers (PLC). These improvements are <br />going to be implemented to the WTP control system to upgrade antiquated <br />hardware and add to the County's redundancy and reliability with their <br />treatment process control. Indian River County Utilities Department desires to <br />publicly advertise these improvements for bidding and desires to utilize the <br />services of Kimley-Horn, and it's subconsultants, to provide construction phase <br />services and programming and integration assistance for these proposed <br />improvements. <br />The following scope outlines the work necessary to provide construction phase <br />services for the proposed improvements, and the integration labor required to <br />program each of the respective upgrades to the PLCs, remote I/O panels and <br />various other components. <br />SCOPE OF WORK <br />Consultant will utilize the services and provide coordination of Control Systems <br />Design, Inc., and C&W Engineering in the execution of these tasks. <br />TASK 1— CONSTRUCTION PHASE SERVICES <br />Consultant will attend one (1) pre -construction meeting with the Contractor, <br />Owner, Electrical Engineer, and Integrator. <br />Consultant will review shop drawings for conformance with the bid documents. <br />It is assumed that up to ten (10) shop drawings will be reviewed. <br />Consultant will respond to a reasonable number of requests for information (up <br />to 4 assumed). <br />218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.