My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2021-0442-FOF-EI <br />DOCKET NO. 20210001 -EI <br />PAGE 17 <br />TECO: <br />Table 21-2 <br />TECO Fuel Recovery Line Loss Multipliers <br />for the period Januarv-December. 2022 <br />Delivery Voltage Level <br />Line Loss Multiplier <br />Transmission <br />0.98 <br />Distribution Primary <br />0.99 <br />Distribution Secondary <br />1.00 <br />Lighting Service <br />1.00 <br />Source: Schedule E 1-D. <br />ISSUE 22: What are the appropriate fuel cost recovery factors for each rate <br />class/delivery voltage level class adjusted for line losses? <br />Stipulation: <br />DEF: If the Rate Mitigation Plan is approved, the appropriate fuel cost recovery factors <br />for each rate class/delivery voltage level class adjusted for line losses for the <br />period January 2022 through December 2022, are shown in Table 22-1(a) below: <br />Table 22-1(a) <br />Fuel Cost Recovery Factors for the period Januarv-December_ 2022 <br />Source: Schedule E 1-E (Exhibit GPD -3, Part 2, Page 1 of 1). <br />If the Rate Mitigation Plan is denied, the; appropriate fuel cost recovery factors for each rate <br />class/delivery voltage level class adjusted :for line losses for the period January 2022 through <br />December 2022, are shown in Table 22-1(b) below <br />Fuel Cost Recovery Factors <br />Time of Use <br />Delivery <br />cents/kWh <br />cents/kWh <br />Group <br />Voltage <br />First <br />Second <br />On -Peak <br />Off -Peak <br />Super <br />Level <br />Tier <br />Tier <br />Levelized <br />Multiplier <br />Multiplier <br />Off -Peak <br />1.281 <br />0.984 <br />Multiplier <br />0.732 <br />A <br />Transmission <br />-- <br />-- <br />3.912 <br />5.011 <br />3.849 <br />2.864 <br />B <br />Distribution <br />' <br />Primary <br />3.952 <br />5.063 <br />3.889 <br />2.893 <br />C <br />Distribution <br />Secondary <br />3.681 <br />4.751. <br />3.992 <br />5.1141 <br />3.928 <br />1 2.922 <br />D <br />Lighting <br />Service <br />-- <br />-- <br />3.700 <br />-- <br />-- <br />-- <br />Source: Schedule E 1-E (Exhibit GPD -3, Part 2, Page 1 of 1). <br />If the Rate Mitigation Plan is denied, the; appropriate fuel cost recovery factors for each rate <br />class/delivery voltage level class adjusted :for line losses for the period January 2022 through <br />December 2022, are shown in Table 22-1(b) below <br />
The URL can be used to link to this page
Your browser does not support the video tag.