My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C & W engineering, Inc <br />Electrical Consultants <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />February 18, 2021 <br />Nick Black, P.E. <br />Kimley Horn & Associates <br />1920 Wekiva Way <br />Suite 200 <br />West Palm Beach, FL 33411 <br />Subject: IRC Hobart WTP Electrical PLC-SCADA Improvements Construction <br />Services Proposal <br />C&W Ref. 66437.CS <br />Dear Nick: <br />I am pleased to submit this proposal for your consideration to provide Electrical <br />Engineering Services during the constructicn phase of the PLC improvements to the <br />Hobart WTP. Below is a summary of our tasks during construction. <br />1. Attend a Pre -construction meeting and respond to questions. <br />2. Review shop drawings. <br />3. Respond to Contractor RFIs. <br />4. Provide a field progress observation to the site during different phases <br />of construction, provide a report for each visit. Total of 3. <br />5. Attend the startup of RIO 5 PLC and Plant site Pump Station Panel <br />when these get upgraded with the PLC Kit. <br />6. Attend the startup of one MOV at the south process area (Trains 1 <br />through 4) and one MOV at the north process area (Trains 5 through 8) <br />7. Attend 3 VIRTUAL monthly meetings during construction. <br />8. Review O&M manuals. <br />9. Provide as -built drawings based on Contractor provided redlines. <br />CONSTRUCTION SERVICES <br />Coordination <br />Kimley Horn and Associates <br />Owner <br />CSD personnel <br />Contractor <br />223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.