Laserfiche WebLink
ORDER NO. PSC-2021-0442-FOF-EI <br />DOCKET NO. 20210001 -EI <br />PAGE 26 <br />ISSUE 33: What are the appropriate capacity cost recovery factors for the period <br />January 2022 through December 2022? <br />Stipulation: <br />DEF: The appropriate capacity cost 'recovery factors for the period January 2022 <br />through December 2022 is shown in Tables 33-1A and 33-1B below: <br />Table 33-1A <br />DEF Capacity Cost Recovery Factors for the period January 2022 - April 2022 <br />Rate Class <br />Capacity and ISFSI <br />Cost Recovery Factors <br />0/kWh <br />$/kW -month <br />Residential (RS -1, RST -1, RSL -1, RSL -2, RSS-1) <br />At Secondary Voltage <br />1.103 <br />General Service Non -Demand GS -1, GST -1 <br />At Secondary Voltage <br />0.966 <br />At Primary Voltage <br />0.956 <br />At Transmission Voltage <br />0.947 <br />General Service GS -2 <br />0.683 <br />Lighting LS -1 <br />0.285 <br />General Service Demand GSD -1, GSDT-1, SS -1 <br />At Secondary Voltage <br />2.85 <br />At Primary Voltage <br />2.82 <br />At Transmission Voltage <br />2.79 <br />Curtailable (CS 1, CST -1, CS -2, CST -2, CS -3, CST -3, SS -3) <br />At Secondary Voltage <br />1.19 <br />At Primary Voltage <br />1.18 <br />At Transmission Voltage <br />1.16 <br />Interruptible IS -1, IST -1, IS -2, IST -2, SS -2 <br />At Secondary Voltage <br />2.26 <br />At Primary Voltage <br />2.24 <br />At Transmission Voltage <br />2.21 <br />Standby MonthSS-1, 2, 3 <br />At Secondary Voltage <br />0.274 <br />At Primary Voltage <br />0.271 <br />At Transmission Voltage <br />0.268 <br />Standby Dail SS -1, 2, 3 <br />At Secondary Voltage <br />0.130 <br />At Primary Voltage <br />0.129 <br />At Transmission Voltage <br />0.127 <br />Source: Schedule E12 -E (Exhibit GPD -3, Part 3, Page 3 of 3). <br />