My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-011
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:58:22 AM
Creation date
2/11/2022 10:14:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/18/2022
Control Number
2022-011
Agenda Item Number
8.A.
Entity Name
Don Hinkle Construction, Inc.
Subject
Indian River County Tax Collector’s Office Expansion
Area
1800 27th Street, Administration Building B
Project Number
IRC-2030
Bid Number
2022018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract Documents <br />shall be that of the former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required of OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />A. OWNER's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br />identifying and making available to CONTRACTOR <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders as indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in <br />paragraph 13.03.B. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the Work. <br />OWNER will not be responsible for CONTRACTOR's <br />failure to perform the Work in accordance with the <br />Contract Documents. <br />8.10 Undisclosed Hazardous Environmental <br />Condition <br />A. OWNER's responsibility in respect to an <br />undisclosed Hazardous Environmental Condition is set <br />forth in paragraph 4.06. <br />8.11 Evidence of Financial Arrangements <br />A. If and to the extent OWNER has agreed to <br />furnish CONTRACTOR reasonable evidence that <br />financial arrangements have been made to satisfy <br />OWNER's obligations under the Contract Documents, <br />OWNER's responsibility in respect thereof will be as <br />set forth in the Supplementary Conditions. <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be OWNER's representative <br />during the construction period. The duties and <br />responsibilities and the limitations of authority of <br />ENGINEER as OWNER's representative during <br />construction are set forth in the Contract Documents <br />and will not be changed without written consent of <br />OWNER and ENGINEER. <br />9.02 Visits to Site <br />A. ENGINEER will make visits to the Site at inter- <br />vals appropriate to the various stages of construction <br />as ENGINEER deems necessary in order to observe <br />as an experienced and qualified design professional <br />the progress that has been made and the quality of the <br />various aspects of CONTRACTOR's executed Work. <br />Based on information obtained during such visits and <br />observations, ENGINEER, for the benefit of OWNER, <br />General Conditions - 00700 - 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.