C. If Laws or Regulations of any public body
<br />having jurisdiction require any Work (or part thereof)
<br />specifically to be inspected, tested, or approved by an
<br />employee or other representative of such public body,
<br />CONTRACTOR shall assume full responsibility for
<br />arranging and obtaining such inspections, tests, or
<br />approvals, pay all costs in connection therewith, and
<br />furnish ENGINEER the required certificates of inspec-
<br />tion or approval.
<br />D. CONTRACTOR shall be responsible for
<br />arranging and obtaining and shall pay all costs in
<br />connection with any inspections, tests, or approvals
<br />required for OWNER's and ENGINEER's acceptance
<br />of materials or equipment to be incorporated in the
<br />Work; or acceptance of materials, mix designs, or
<br />equipment submitted for approval prior to
<br />CONTRACTOR's purchase thereof for incorporation in
<br />the Work. Such inspections, tests, or approvals shall
<br />be performed by organizations acceptable to OWNER
<br />and ENGINEER.
<br />E. If any Work (or the work of others) that is to be
<br />inspected, tested, or approved is covered by CON-
<br />TRACTOR without written concurrence of ENGINEER,
<br />it must, if requested by ENGINEER, be uncovered for
<br />observation.
<br />F. Uncovering Work as provided in paragraph
<br />13.03.E shall be at CONTRACTOR's expense unless
<br />CONTRACTOR has given ENGINEER timely notice of
<br />CONTRACTOR's intention to cover the same and
<br />ENGINEER has not acted with reasonable promptness
<br />in response to such notice.
<br />13.04 Uncovering Work
<br />A. If any Work is covered contrary to the written
<br />request of ENGINEER, it must, if requested by ENGI-
<br />NEER, be uncovered for ENGINEER's observation
<br />and replaced at CONTRACTOR's expense.
<br />B. If ENGINEER considers it necessary or
<br />advisable that covered Work be observed by ENGI-
<br />NEER or inspected or tested by others, CONTRAC-
<br />TOR, at ENGINEER's request, shall uncover, expose,
<br />or otherwise make available for observation, nspec-
<br />tion, or testing as ENGINEER may require, that portion
<br />of the Work in question, furnishing all necessary labor,
<br />material, and equipment. If it is found that such Work
<br />is defective, CONTRACTOR shall pay all Claims,
<br />costs, losses, and damages (including but not limited
<br />to all fees and charges of engineers, architects,
<br />attorneys, and other professionals and all court or
<br />arbitration or other dispute resolution costs) arising out
<br />of or relating to such uncovering, exposure, observa-
<br />tion, inspection, and testing, and of satisfactory
<br />replacement or reconstruction (including but not limited
<br />to all costs of repair or replacement of work of others);
<br />and OWNER shall be entitled to an appropriate
<br />decrease in the Contract Price. If the parties are
<br />unable to agree as to the amount thereof, OWNER
<br />may make a Claim therefor as provided in paragraph
<br />10.05. If, however, such Work is not found to be
<br />defective, CONTRACTOR shall be allowed an
<br />increase in the Contract Price or an extension of the
<br />Contract Times (or Milestones), or both, directly
<br />attributable to such uncovering, exposure,
<br />observation, inspection, testing, replacement, and
<br />reconstruction. If the parties are unable to agree as to
<br />the amount or extent thereof, CONTRACTOR may
<br />make a Claim therefor as provided in paragraph 10.05.
<br />13.05 OWNER May Stop the Work
<br />13.06 Correction or Removal of Defective Work
<br />A. CONTRACTOR shall correct all defective
<br />Work, whether or not fabricated, installed, or
<br />completed, or, if the Work has been rejected by ENGI-
<br />NEER, remove it from the Project and replace it with
<br />Work that is not defective. CONTRACTOR shall pay
<br />all Claims, costs, losses, and damages (including but
<br />not limited to all fees and charges of engineers,
<br />architects, attorneys, and other professionals and all
<br />court or arbitration or other dispute resolution costs)
<br />arising out of or relating to such correction or removal
<br />(including but not limited to all costs of repair or
<br />replacement of work of others).
<br />13.07 Correction Period
<br />A.
<br />Completion OF SUGh longeF peFied ef time as may be
<br />PFeSGFibed by Laws 9F Regulations eF by the tem;s-of
<br />General Conditions - 00700 - 30