My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-011
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:58:22 AM
Creation date
2/11/2022 10:14:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/18/2022
Control Number
2022-011
Agenda Item Number
8.A.
Entity Name
Don Hinkle Construction, Inc.
Subject
Indian River County Tax Collector’s Office Expansion
Area
1800 27th Street, Administration Building B
Project Number
IRC-2030
Bid Number
2022018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -2030 <br />SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR <br />Project: TAX COLLECTOR OFFICE EXPANSION <br />OWNER's Project No. IRC -2030 OWNER'S Bid No. 2022018 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Reason for Change Order: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />❑ Unit Prices <br />❑ Lump Sum <br />❑ Other: <br />By Change Order: <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />L1 Engineer's Records <br />❑ Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />RECOMMENDED: <br />By: <br />ENGINEER (S gnature) <br />Date: <br />** END OF SECTION** <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />Work Change Directive — 00948 <br />FAPublic WorksIENGINEERING DIVISION PROJECTS\2030 Tax Collector Office Expansion Bldg 8\1-Admin\Bids\Bid DocumentsWaster Contract Documents\DIV <br />0_6_Conditions of the Contract - 20201002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.