Laserfiche WebLink
Division 1—General Requirements, IRC -2030 <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - INSTALLATION: <br />The responsibility for installation and maintenance of adequate traffic control <br />devices, warning devices and barriers, for the protection of the travel in public and <br />workmen, as well as to safeguard the work area in general shall rest with the <br />Contractor. Consideration shall be given to recommendations of the Engineer. The <br />required traffic control devices, warning devices and barriers shall be erected bythe <br />Contractor prior to creation of any hazardous condition and in conjunction with any <br />necessary re-routing of traffic. The Contractor shall immediately remove, turn or <br />cover any devices or barriers which do not apply to existing conditions. All traffic <br />control devices shall conform tc MUTCD standards and shall be clean and relatively <br />undamaged. Damaged devices diminishing legibility and recognition, during either <br />night or day conditions, are not acceptable for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and <br />the procedures and policies described therein shall in no way act as a waiver of any <br />of the terms of the liability of the Contractor or his surety. <br />F. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic <br />at all times. <br />G. The Changeable Variable Message Sign shall be used as necessary. The location, <br />message, and duration shall be as directed by Engineer. <br />H. In addition to above, the Contractor shall comply with INDIAN RIVER COUNTY <br />TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY <br />CONSTRUCTION in Appendix "C". <br />+ + END OF SECTION + + <br />Access Roads, Parking Areas and use of Public Streets - 01550-3 <br />F:\Public Works\ENGINEER] NG DIVISION PROJECTS\2030 Tax Collector Office Expansion Bldg B\1-Admin\Bids\Bid Documents\Master Contract <br />Documents\DIV 1_GENERAL REQUIREMENTS - 20201002.docx <br />