My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-011
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:58:22 AM
Creation date
2/11/2022 10:14:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/18/2022
Control Number
2022-011
Agenda Item Number
8.A.
Entity Name
Don Hinkle Construction, Inc.
Subject
Indian River County Tax Collector’s Office Expansion
Area
1800 27th Street, Administration Building B
Project Number
IRC-2030
Bid Number
2022018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02206 - SITE CLEANUP & RESTORATION <br />1.01 SCOPE <br />A. The Contractor shall furnish all labor, equipment, appliances and materials <br />required or necessary to clean up the site after the construction is completed and <br />to restore items disturbed or damaged due to his construction operation. <br />2.02 GENERAL <br />A. During the progress of the project, the work and the adjacent areas affected <br />thereby shall be kept in a neat. and orderly condition. All rubbish, surplus <br />materials, and unused construction equipment shall be removed. All damage shall <br />be repaired so that the public and private property owners will be inconvenienced <br />as little as possible. <br />B. Where material or debris has been deposited in watercourses, ditches, gutters, <br />drains, or catch -basins as a result of the Contractor's operations, such material or <br />debris shall be entirely removed and satisfactorily disposed of during the progress <br />of the work, and the ditches, channels, drains, etc., shall be kept clean. <br />C. Before the completion of the project, the Contractor shall, unless otherwise <br />especially directed or permitted. in writing, tear down and remove all temporary <br />buildings and structures which he builds; remove all temporary works, tools, and <br />machinery or other construction equipment furnished by him; remove, acceptably <br />disinfect, and cover all organic matter and material containing organic matter in, <br />under, and around privies, houses, and other buildings used by him; remove all <br />rubbish from any grounds which he has occupied; and leave the roads, all parts of <br />the premises and adjacent property affected by his operations, in a neat and <br />satisfactory condition. <br />D. It shall be the responsibility of the Contractor to repair, rebuild, or restore to its <br />former conditions, any and all portions of existing utilities, structures, equipment, <br />appurtenances, trees and shrubs, or facilities, other than those to be paidfor under <br />the specifications, which may be disturbed or damaged due to his construction <br />operations. <br />E. The Contractor shall thoroughly clean all materials and equipment installed by <br />him and his subcontractors and on completion of the workshall deliver the <br />facilities undamaged and in fresh and new -appearing condition. <br />***END OF SECTION*** <br />02206-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.