My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-011
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:58:22 AM
Creation date
2/11/2022 10:14:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/18/2022
Control Number
2022-011
Agenda Item Number
8.A.
Entity Name
Don Hinkle Construction, Inc.
Subject
Indian River County Tax Collector’s Office Expansion
Area
1800 27th Street, Administration Building B
Project Number
IRC-2030
Bid Number
2022018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02500 - UNDERGROUND SPRINKLER IRRIGATION SYSTEM <br />PART 1- IRRIGATION <br />1.01 RELATED WORK SPECIFIED - ELSEWHERE <br />A. Landscaping - Section 02480 <br />B. Landscape Work - Section 02481 <br />C. Mechanical - Division 15000 <br />D. Electrical - Division 16000 <br />E. Drawings and general provisions of Contract, including General & Supplementary <br />Conditions and other Division 1 Specification Sections. apply to this Section. <br />1.02 QUALITY ASSURANCE <br />A. This specification is a guide to establish the desired level of quality and results to <br />best service the Owner's need. The Irrigation Contractor is required to furnish all <br />materials and methods, meters, permits required to insure a complete functioning <br />irrigation system. <br />B. Products of the following manufacturers are acceptable: <br />1. <br />Toro <br />2. <br />Rainbird <br />3. <br />Nelson <br />4. <br />Hunter <br />C. Products of other manufacturers may be proposed under conditions set forth in the <br />Contract Conditions of these Specifications. Any product that does not have as <br />equal acceptance will not be accepted. <br />D. Coordinate Irrigation with Landscaping requirements for watering. <br />1.03 AS BUILT DRAWINGS <br />Furnish typewritten operating instructions and two (2) sets of as -built drawings with <br />circuits color coded. Provide this information immediately following completion and <br />acceptance of the work. <br />PART 2 - PRODUCTS <br />2.01 PIPE <br />A. For all pipe upstream of zone valve -- site irrigation: <br />Size: Per plans. <br />02500-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.