My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/11/2022
CBCC
>
Meetings
>
2020's
>
2022
>
01/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 12:11:26 PM
Creation date
2/11/2022 11:50:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/11/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Graymatter <br />Systems, LLC (hereinafter called SUPPLIER). OWNER and SUPPLIER, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />SUPPLIER shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br />• Task 1. Project Schedule <br />• Task 2. Document the Existing Network <br />• Task 3. Develop the Functional and Non-Function6l System Requirements Document <br />• Task 4. Develop a Preliminary Network Design <br />• Task 5. Develop a Preliminary Computing Design <br />• Task 6. Develop a System Hardening Plan <br />• Task 7. Develop a Preliminary Network and System Monitoring Design <br />• Task 8. Preliminary Design Review (PDR) <br />• Task 9. Final Design Review (FDR) <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Industrial Control System Network Design <br />RFP Number: 2022014 <br />Project Address: 1800 27th Street, Vero Beach, FL, 32960 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 120th day after the date <br />when the Contract Times commence to run. <br />1 <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.