My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-014
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2022 3:10:24 PM
Creation date
2/21/2022 3:09:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/18/2022
Control Number
2022-014
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc
Subject
Work Order No. 14 for Annual Permit, Compliance Monitoring, and Reporting for 2022.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />14 December 2021 <br />Page 9 <br />SWDD of the fee amount and will submit the check for payment of the fee on behalf of <br />SWDD prior to the April 1 deadline. <br />• Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG <br />annually to determine the sulfur content in accordance with ASTM Method D5504-12 or <br />D7493. The samples will be tested by a certified air testing laboratory. The laboratory <br />test results will be used to calculate sulfur emissions and a report prepared for submittal <br />to FDEP. The LFG sulfur content test and reporting will be completed no later than 31 <br />December 2022. <br />Phase 5 — Technical and Miscellaneous Permit Compliance Support and Reporting <br />Under this phase, Geosyntec will provide SWDD with technical support and miscellaneous <br />permit compliance support services related to the Class I landfill and C&D disposal facility on an <br />as needed basis. These services may include: <br />• reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br />• assist SWDD in finalizing the draft SWPPP that was completed and submitted to SWDD <br />in January 2016; <br />• quarterly monitoring and reporting of the LFG monitoring wells located at the perimeter <br />of the site and also in enclosed structures; <br />• miscellaneous permit and compliance support services; <br />• assistance with preparing annual budgets for SWDD; <br />• preparing agenda items for and attending SWDD Board of County Commissioners <br />meetings upon request; <br />• quarterly methane readings as required by the Class I landfill permit; <br />• sampling and reporting for additional monitoring wells and surface water for the C&D <br />debris disposal facility depending on the results of the semi-annual and quarterly <br />sampling and analytical testing; and <br />• other services as needed. <br />As part of these services, Geosyntec proposes to assist SWDD with the evaluation and resolution <br />of issues pertaining to the exceedances in select analytes of the C&D debris disposal facility and <br />Class I landfill monitoring wells and surface sample sites should these issues arise. <br />SCHEDULE <br />NCP2021-3441/JL21090 2022 Compliance MonitoringProposal.Einal.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.