My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-015
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 12:09:27 PM
Creation date
2/21/2022 3:13:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/18/2022
Control Number
2022-015
Agenda Item Number
15.B.3.
Entity Name
Kimley-Horn and Associates Inc
Subject
Amendment No. 1 to Work Order No. 44,
Landfill Gas Flare Skid Improvements and Pipeline Extension
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
locations. The additional borings are required to supplement the previously <br /> budgeted hand auger samples, for structural purposes. <br /> Subtask 1.2 Landfill Gas Pipeline Design <br /> 1.2.1 30 Percent Design <br /> No changes. <br /> 1.2.2 60 Percent Design <br /> No changes. <br /> 1.2.3 90 Percent Design and Final Bid Package <br /> No changes <br /> 1.2.4 Bidding and Project Management <br /> This task has been amended to accommodate minor changes in project scope and <br /> schedule. <br /> Subtask 1.3 Coordination with Heartland <br /> The coordination efforts with the Heartland design team have required more effort than <br /> initially anticipated. This task has been modified to accommodate additional efforts <br /> related to the original scope(as summarized immediately below). <br /> The Consultant will work closely with the County and Heartland to review the overall <br /> design, equipment specifications and construction plan of the evaporation system.The <br /> Consultant will serve as the Owner's representative and will review the details of the <br /> system integration between the Heartland Facility equipment and SWDD's proposed <br /> landfill assets. This task will include the following activities: <br /> • Allocate and assign key engineering resources (such as controls, mechanical, and <br /> process engineers)as necessary to support the project during critical design review <br /> stages; <br /> • Review detailed drawings, calculations and other information submitted by the <br /> Heartland engineering team. These may include natural gas and LFG piping <br /> designs, mechanical piping drawings, electrical and controls designs for valves, <br /> instruments and other electrical equipment that could affect the landfill assets. <br /> • Review the master project schedule and provide comments to SWDD regarding <br /> risks in achieving critical milestones by the developer. Please note that to do this, <br /> the Consultant will request monthly schedule updates from Heartland and provide <br /> comments as necessary. <br /> • The Consultant will monitor the engineering and coordination performed by <br /> developer/contractor of the facility. <br /> • The Consultant will review all design and equipment specifications regarding the <br /> integration of piping with the landfill system. <br /> • Perform site visits if necessary (travel expenses to be invoiced as incurred for the <br /> necessary number of site visits). <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.