My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/12/1995
CBCC
>
Meetings
>
1990's
>
1995
>
9/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:12 PM
Creation date
6/16/2015 2:47:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Tippin questioned the approximate 40 percent <br />increase in Change Order #1, emphasizing that the cost went from <br />$46,823.97 to $64,785.72. He couldn't understand why the 76 <br />additional meter tie-ins were not anticipated, because he could <br />have walked those two subdivisions and arrived at the exact total <br />of tie-ins to expect. <br />Utilities Director Terry Pinto explained that this is a <br />project that we received and took over from the City of Vero Beach. <br />We really don't know what is there until we get into the field and <br />if something is found that is different from the plans that are on <br />record, the change has to be made at that point. We have a <br />contract that covers all of the costs on an item basis. The <br />contract, which is bid out, covers all of the different problems <br />that you may find in the field. <br />Commissioner Tippin pointed out that in his 27 years of <br />experience in running a small business, he didn't believe he ever <br />miscalculated the cost of anything by 40 percent. <br />Director Pinto stated that he would get a detailed explanation <br />to Commissioner Tippin. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously approved <br />Change Order No. 1 and final pay request of <br />$23,366.84 to Driveways, Inc. <br />CHANGE ORDER NO. 1 IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />WATER AND SEWER SERVICE EXTENSIONS - 48TH PLACE AND <br />28TH COURT <br />The Board reviewed the following memo dated 8/14/95: <br />DATE: AUGUST 14, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANC G. PINVol <br />DIRECT OF UTISEVICES <br />PREPARED WILLI MCCAIN <br />AND STAFFED CAPI OJECTS E EER <br />BY: DE OF TY SERVICES <br />SUBJECT: 48TH PI AND 28TH COURT WATER AND SEWER SERVICE <br />EXTENSIONS <br />INDIAN RIVER COUNTY PROJECT NO. U{�-95-20-DS <br />US -95-21-M <br />31 <br />SEPTEMBER 12, 1995 aoox 96 �.ATu 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.