Laserfiche WebLink
164 <br />SWDD Item <br />Indian River County, Florida <br />Solid Waste Disposal District <br />Board Memorandum <br />Date: January 7, 2022 <br />To: Jason E. Brown, County Administrator <br />From: Matthew Jordan, Interim Director of Utility Services <br />Prepared By: Himanshu H. Mehta, PE, Mana&ng Director, Solid Waste Disposal District <br />Subject: Work Order No. 14 to Geosyntec for Annual Permit, Compliance Monitoring, and <br />Reporting for 2022 <br />Descriptions and Conditions: <br />The Solid Waste Disposal District (SWDD) landfall operation is a highly regulated activity, which requires <br />environmental compliance documentation in accordance with several different permits. Many of the <br />compliance reports are prepared and certified by a third -party professional engineer. This agenda item <br />requests authorization to engage the engineering firm of Gecsyntec Consultants (Geosyntec) to perform the <br />following tasks related to both permitting and reporting: <br />1. Semi-annual and annual reports to assess the characteristics of ground and surface water at the site <br />generated by the Class I landfill in accordance with the site's landfill permits. <br />2. Quarterly Assessment monitoring and reporting for the Class I landfill, and Construction and <br />Demolition (C&D) Debris Disposal Facility. <br />3. Annual reports required by the site's Tit"e V air quality permit, including the annual statement of <br />compliance, the annual operating report, semi-annual monitoring report, and the annual landfill gas <br />sulfur content test. <br />4. Landfill Gas Migration Monitoring <br />5. Multi -Sector General Permit <br />In addition, a general technical assistance and permit compliance phase is included, as SWDD often requires <br />engineering, technical, and construction services assistance in connection with annual facility upgrade, <br />compliance, and operations. <br />Analysis: <br />Geosyntec has prepared Work Order No. 14, prcvided in Attachment 1, for engineering services detailing <br />the scope of work, budget, and schedule for each of the tasks. The fees to be paid by SWDD for the <br />execution of this work authorization are in accordance with the engineer's continuing consulting services <br />SWDD Agenda - WO No 14 Geosyntec SWDD Annual Permit Compliance Monitoring Reporting Page 1W <br />