Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existirg under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />ana <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Wcrk as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Project consists of expanding the Tax Collector office into the existing front patio <br />area by enclosing the area to create an enlarged customer service space. Included in <br />the scope of work is the demolition of existing exterior wall and windows, new <br />customer service work stations, new flooring throughout customer area, drywall, <br />ceiling tile, HVAC, electrical, and fire suppression modifications to provide a turn -key <br />facility upon completion of the project. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: TAX COLLECTOR OFFICE EXPANSION <br />County Project Number: IRC -2030 <br />Bid Number: 2022018 <br />Project Address: 180027 th St. Vero Beach, FL. 32960 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Cortract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 1201h calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />7 <br />