My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-036
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 4:10:56 PM
Creation date
3/11/2022 9:46:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/15/2022
Control Number
2022-036
Agenda Item Number
8.O.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
Year 2 Post-Construction Environmental Monitoring
Work Order #10 Sector 5 Beach and Dune Restoration Project (IRC1923),
APTIM Work Order No. 2018029-10.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Kathryn Brown <br />Lead Marine Biologist <br />APTIM <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Dear Ms. Brown: <br />ECOLOGICAL ASSOCIATES, INC. <br />February 8, 2022 <br />Ecological Associates, Inc. (EAI) is pleased to submit its Scope of Work and Cost Proposal <br />for providing professional environmental services in support of Indian River County's <br />Sector 5 Beach and Dune Restoration Project. This proposal addresses post -construction <br />permit -compliance monitoring along approximately 3.5 miles of beach during the 2022 <br />nesting season, as described in the Scope of Work presented below. This monitoring will <br />comply with all applicable conditions set forth in the regulatory permits and related <br />authorizations issued for the project. <br />SCOPE OF WORK <br />This scope of work was developed based on conditions and requirements set forth in the <br />following documents: <br />➢ Florida Department of Environmental Protection (FDEP) Joint Coastal Permit <br />(JCP) No. 0363427 -001 -JC <br />Task 1: Project Management <br />The Project Area extends approximately 3.5 miles from FDEP Range Monument R-70 <br />near Mariner Beach Lane to R-86 near Bay Oak Lane. An EAI project manager will <br />oversee all fieldwork and data management operations and consult with APTIM on <br />permit requirements, as necessary. A project schedule, as well as field survey <br />schedules, will be created and maintained throughout the life of the project. All <br />equipment and supplies necessary to successfully implement this Scope of Work are <br />available. <br />Task 2: Post -construction Escarpment Surveys (FDEP Specific Condition 17) <br />Beginning on March 1, 2022, escarpment (scarp) surveys will be conducted on a <br />weekly basis within the Sector 5 Beach and Dune Restoration Project Area through <br />October 31, 2022. In accordance with Florida Fish and Wildlife Conservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.