My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-037
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 10:00:48 AM
Creation date
3/11/2022 10:00:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/15/2022
Control Number
2022-037
Agenda Item Number
8.P.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
2022 Post-Construction Environmental Monitoring
Sector 3 – 2018006-13, Work Order #13.
Sector 3 Beach and Dune Restoration Project #IRC1925 APTIM.
Project Number
IRC-1925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ecological Associates, Inc.—Scope of Work and Cost Proposal 3 <br /> State and Federal Authorizations.All sea turtle monitoring and related activities will <br /> be performed under FWC Marine Turtle Permit#261 issued by FWC to EAI Director <br /> of Operations, Niki Desjardin. All persons engaged in monitoring performed by EAI <br /> for the Sector 3 Beach and Dune Nourishment Project will be listed on the permit. <br /> All data will be subject to rigorous QA/QC protocols and stored in EAI's project- <br /> specific database.Monthly summary reports will be furnished to APTIM.These reports <br /> will tabulate the dates and times of monitoring, names of monitoring personnel, <br /> numbers of sea turtle emergences by species, and numbers of nests marked and <br /> evaluated for reproductive success,as applicable.Monthly reports will be submitted to <br /> APTIM on the last day of the month following delivery of services(e.g.,March report <br /> due no later than April 30), or as otherwise mutually agreed upon. Daily sea turtle <br /> monitoring will be charged at a daily rate. *Monthly summary reports on sea turtle <br /> nesting and predation will also be sent to Archie Carr National Wildlife Refuge to <br /> assist management efforts. <br /> Task 4: Nest Marking and Monitoring (FDEP Specific Condition 15) <br /> A representative sample of nests in the Project and Reference Areas will be marked for <br /> determination of nest fate and reproductive success (not to exceed 150 nests total). <br /> Nests will be marked using a series of stakes and surveyor's tape. These nests will be <br /> monitored throughout their incubation period to determine nest fate (e.g., hatched, <br /> washed out, depredated, vandalized, etc.). After an appropriate incubation period, and <br /> in accordance with the FWC Handbook, nests will be excavated to determine <br /> reproductive success. Two measures of reproductive success will be calculated: <br /> hatching success (the percentage of eggs in the nest that hatch) and emerging success <br /> (the percentage of eggs in the nest that produce hatchlings which successfully escape <br /> from the nest). <br /> Task 5: Nesting Shorebird Monitoring (FDEP Specific Condition 21) <br /> Following completion of construction, EAI will conduct surveys to identify <br /> shorebird/seabird nesting activity in the Project Area weekly through September 1, <br /> 2022 if no shorebird nesting activity is observed.The surveys will be conducted on foot <br /> or by ATV at dawn and will cover all potential beach nesting bird habitats that may be <br /> impacted by construction activities. EAI will report all breeding activity to the Florida <br /> Shorebird Database within one week of data collection. Shorebird monitoring activities <br /> will comply with all protocols outlined on the Florida Shorebird Database website. <br /> Nesting shorebird surveys will be charged at a per survey rate. *If construction <br /> activities take place entirely outside the breeding season, shorebird surveys are not <br /> required. <br /> Tasks 6a-6b: Post-Construction Escarpment Surveys (FDEP Specific Condition 18) <br /> If construction is completed prior to March 1, 2022, a pre-season escarpment (scarp) <br />
The URL can be used to link to this page
Your browser does not support the video tag.