Laserfiche WebLink
APTIM <br /> February 9, 2022 <br /> Page 2 of 6 <br /> Task 1A:Scope of Work <br /> 1) Hardbottom Edge Mapping: <br /> APTIM shall map the position of the nearshore hardbottom edge for the Phase 1 Sector 3 project area, <br /> including 1000 feet north (updrift), from R-19.5 to R-40,for a length of approximately 3.8 miles. A buoy <br /> with a Differential Global Positioning System (DGPS)antenna linked to a topside laptop computer running <br /> HYPACK navigational software will be towed by divers to record the position of the nearshore hardbottom <br /> edge. The divers will follow the inshore contour of the most prominent hardbottom-sand interface. The <br /> purpose of the survey is to provide a comparison for pre- and all subsequent post-construction edge <br /> delineations. <br /> 2) Monitoring Permanent Transects: <br /> Thirty (38) permanent transects were established along the length of project influence, which includes <br /> 1000 feet north (updrift) and 2000 feet south (downdrift). This includes twenty-four (24) biological <br /> monitoring transects and fourteen (14) sediment-only transects. Phase 1 monitoring shall be conducted <br /> from R-20 to R-40 and will include twenty-two (22) permanent transects (15 biological and 7 sediment- <br /> only). All transects were established perpendicular to the shoreline and extend from the landward <br /> hardbottom edge to a maximum distance of 50 meters seaward. <br /> APTIM will conduct the biological survey of the hardbottom using the following methods: <br /> 1) Quadrat Assessments: Up to nine (9) 0.5-m2 quadrats sampled along each transect to quantify the <br /> benthic community. <br /> 2) Sediment Measurements: Collected using line-intercept and 1-m interval sediment depth <br /> measurements. <br /> 3) Video/Photo Documentation: Collected for the length of each transect. <br /> It is anticipated that the effort to delineate the hardbottom edge and monitor the transects will take up <br /> to twelve(12)field days based on previous monitoring events. <br /> The data will be compiled and incorporated into a GIS database and in situ data will be entered into an <br /> Access database.Time to complete data entry, reduction, analyses, and report production is included in <br /> the cost estimate to address the data management and reporting requirements for those 12 days of field <br /> operations. <br /> Task 1A: Deliverable <br /> Raw data will be provided to FDEP and the County including a PDF of the scanned datasheets, excel <br /> spreadsheets with quadrat data, interval sediment depth measurements and line-intercept data, shapefiles <br /> of the hardbottom edge survey, video/photo documentation. Additionally, APTIM will provide a map of the <br /> project area and adjacent hardbottom resources with the hardbottom edge delineation and monitoring <br /> transects overlaid onto the most recent aerial photography(in digital format). <br /> A post-construction biological monitoring report will be generated for submittal to the County and regulatory <br /> agencies. <br /> Task 1A:Schedule <br />