Laserfiche WebLink
A APTIM February 9, 2022 <br /> Page 4 of 6 <br /> The nearshore hardbottom monitoring for this task shall include: <br /> • Hardbottom edge mapping(R-40 to R-57) <br /> • Monitoring permanent transects(R-40 to R-56) <br /> Task 2A:Scope of Work <br /> 3) Hardbottom Edge Mapping: <br /> APTIM shall map the position of the nearshore hardbottom edge for the Phase 2 Sector 3 project area, <br /> from R-40 to R-57, including 2000 feet south(downdrift)of the project area,for a length of approximately <br /> 3.2 miles.The same methods described above in Task 1A will be conducted. <br /> 4) Monitoring Permanent Transects: <br /> Phase 2 monitoring shall be conducted from R-40 to R-56 and will include sixteen (16) permanent <br /> transects (9 biological and 7 sediment-only). The same methods described above in Task 1A will be <br /> conducted. <br /> It is anticipated that the effort to delineate the hardbottom edge and monitor the transects will take up <br /> to eight (8)field days based on previous monitoring events. <br /> The data will be compiled and incorporated into a GIS database and in situ data will be entered into an <br /> Access database.Time to complete data entry, reduction, analyses, and report production is included in <br /> the cost estimate to address the data management and reporting requirements for those 8 days of field <br /> operations. <br /> Task 2A: Deliverable <br /> Deliverables will be prepared as described above in Task 1A and will be submitted concurrently with Task 1A <br /> deliverables. <br /> Task 2A:Schedule <br /> The Immediate Post-Construction monitoring event will take place during summer 2022 concurrently with the <br /> Year 1 Post-Construction monitoring event. Raw data from field operations will be submitted to the County <br /> and FDEP within 45 days and the monitoring report will be submitted within 90 days of completion of the <br /> survey. <br /> Task 2A:Cost <br /> The lump sum cost for this task is$70,308.55. <br /> 2B.Sea Turtle and Shorebird Monitoring <br /> The Sector 3 2022 sea turtle and shorebird monitoring will be managed and coordinated by APTIM, and <br /> conducted by APTIM's approved subconsultant, EAI. <br /> Task 2B:Scope of Work <br /> APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination <br /> to the County.The 2022 sea turtle and shorebird monitoring effort along the approximate 2.95 mile shoreline <br />