Laserfiche WebLink
_.,........--ii---...0.----,,„,,,,,--- -.......... <br /> / . <br /> i---..LA <br /> ECOLOGICAL ASSOCIATES, INC. <br /> Ms.Nicole Sharp February 7, 2022 <br /> APTIM <br /> 2481 NW Boca Raton Blvd. <br /> Boca Raton, FL 33431 <br /> Dear Ms. Sharp: <br /> Ecological Associates,Inc.(EAI)is pleased to submit its Scope of Work and Cost Proposal <br /> for providing professional environmental services in support of Indian River County's <br /> Sector 3 Beach and Dune Nourishment Project. This proposal addresses post-construction <br /> sea turtle permit-compliance monitoring along approximately 3.7 miles of beach(Phase 1) <br /> during the 2022 nesting season, along with an appropriate reference beach,as described in <br /> the Scope of Work presented below. This monitoring will comply with all applicable <br /> conditions set forth in the regulatory permits and related authorizations issued for the <br /> project. <br /> SCOPE OF WORK <br /> This scope of work was developed based on conditions and requirements set forth in <br /> standard regulatory permits and the following documents: <br /> > Florida Department of Environmental Protection (FDEP) Joint Coastal Permit <br /> (JCP)No. 0285993-009-JC <br /> ➢ U.S. Fish and Wildlife Service (USFWS) Revised Statewide Programmatic <br /> Biological Opinion(BO)dated March 13,2015 <br /> Task 1: Mobilization <br /> All equipment, staff, and schedules will be prepared prior to project commencement. <br /> The Phase 1 Project Area extends approximately 3.7 miles from FDEP Range <br /> Monument R-20 to R-40. The Reference Area, approximately 3.8 miles south of the <br /> Project and outside of the influence of any fill placement activities, lies between R-60 <br /> and R-68. Pre-existing survey zone boundaries, consistent with those established by <br /> Indian River County under its Habitat Conservation Plan, will be verified and re- <br /> marked,and project-specific data sheets and a database will be created. <br />