My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-040
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 4:18:50 PM
Creation date
3/14/2022 9:42:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/11/2022
Control Number
2022-040
Agenda Item Number
Signed by County Administrator
Entity Name
MBV Engineering, Inc.
Subject
Work Order 23 for Emergency Services Operation Complex Master Plan Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />It is understood the COUNTY Emergency Services Department desires to develop a Master <br />Development Site Plan for the existing EOC complex that will focus on a training area that will be <br />supported by an interior roadway to the west, training pads and a future storage warehouse building. <br />It is understood the Master Development Site Plan will assist the EOC in analyzing future build -out of <br />the site in phases and what the anticipated site costs may be for each phase. The CONSULTANT will <br />conduct meeting(s) with the EOC staff to discuss the details of the plan and the phases for each desired <br />improvement. A Master Development Plan will be designed from the information collected during the <br />meeting(s) and presented to EOC staff for review. It should be noted the CONSULTNAT shall develop <br />the Existing Conditions Plan pursuant to the latest aerial imagery reflected on the Indian River County <br />Property Appraisers website. Alternatively, should the COUNTY have access to the EOC complex <br />existing conditions survey in either AUTOCAD or pdf formats, then a copy of said file can be provided <br />to CONSULTANT for use in development of the Master Plan. <br />The CONSULTANT proposes to provide the COUNTY the below scope of work associated with the <br />Master Development Plan and as further described below. <br />Task 1— Master Plan Development <br />MBV will coordinate with the COUNTY, or COUNTY's survey consultant, as required, on the existing <br />conditions survey data and information. It is understood COUNTY will provide all necessary topographic <br />survey data in CAD format to MBV for utilization in the design plans. It is also understood all vertical <br />and horizontal locates will also be provided by the COUNTY or COUNTY's survey consultant. MBV shall <br />review provided survey data and shall provide in writing to the COUNTY comments for any areas <br />requiring further data collection needed to assist in the proper project design. MBV shall utilize final <br />existing conditions data for the base line information for the project. <br />Task 2 - Cost Estimates <br />The consultant will produce three (3) Engineer's Opinion of Probable Cost (EOPC) at the 100% design <br />milestone of the project based on a 3 -phased construction build -out. The final plan and estimates will <br />be provided to COUNTY based upon English units and provided in digital and PDF formats. NOTE: The <br />cost estimates will be for site development only. Building cost estimates will require the services of an <br />architect or general contractor for estimated pricings. <br />EXHIBIT B - SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above described services will be provided based <br />on the following schedule: <br />• SO% Master Development Site Plan <br />• 100% Master Development Site Plan <br />30 days from the latter of the issuance of <br />Notice to Proceed <br />30 days from receipt of IRC review <br />comments from 50% Review Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.