Laserfiche WebLink
EXHIBIT A - SCOPE OF WORK <br />It is understood the COUNTY Emergency Services Department desires to develop a Master <br />Development Site Plan for the existing EOC complex that will focus on a training area that will be <br />supported by an interior roadway to the west, training pads and a future storage warehouse building. <br />It is understood the Master Development Site Plan will assist the EOC in analyzing future build -out of <br />the site in phases and what the anticipated site costs may be for each phase. The CONSULTANT will <br />conduct meeting(s) with the EOC staff to discuss the details of the plan and the phases for each desired <br />improvement. A Master Development Plan will be designed from the information collected during the <br />meeting(s) and presented to EOC staff for review. It should be noted the CONSULTNAT shall develop <br />the Existing Conditions Plan pursuant to the latest aerial imagery reflected on the Indian River County <br />Property Appraisers website. Alternatively, should the COUNTY have access to the EOC complex <br />existing conditions survey in either AUTOCAD or pdf formats, then a copy of said file can be provided <br />to CONSULTANT for use in development of the Master Plan. <br />The CONSULTANT proposes to provide the COUNTY the below scope of work associated with the <br />Master Development Plan and as further described below. <br />Task 1— Master Plan Development <br />MBV will coordinate with the COUNTY, or COUNTY's survey consultant, as required, on the existing <br />conditions survey data and information. It is understood COUNTY will provide all necessary topographic <br />survey data in CAD format to MBV for utilization in the design plans. It is also understood all vertical <br />and horizontal locates will also be provided by the COUNTY or COUNTY's survey consultant. MBV shall <br />review provided survey data and shall provide in writing to the COUNTY comments for any areas <br />requiring further data collection needed to assist in the proper project design. MBV shall utilize final <br />existing conditions data for the base line information for the project. <br />Task 2 - Cost Estimates <br />The consultant will produce three (3) Engineer's Opinion of Probable Cost (EOPC) at the 100% design <br />milestone of the project based on a 3 -phased construction build -out. The final plan and estimates will <br />be provided to COUNTY based upon English units and provided in digital and PDF formats. NOTE: The <br />cost estimates will be for site development only. Building cost estimates will require the services of an <br />architect or general contractor for estimated pricings. <br />EXHIBIT B - SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above described services will be provided based <br />on the following schedule: <br />• SO% Master Development Site Plan <br />• 100% Master Development Site Plan <br />30 days from the latter of the issuance of <br />Notice to Proceed <br />30 days from receipt of IRC review <br />comments from 50% Review Phase <br />