My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-082
CBCC
>
Resolutions
>
1980'S
>
1989
>
1989-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 11:12:34 AM
Creation date
3/14/2022 11:04:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1989-082
Approved Date
08/23/1989
Resolution Type
Approve Evaluation & Appraisal Report of 1982 Comp Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OB=IVES - E. SOLID WASTE STATUS ACTIONS TAKEN <br />1. The county will continue to serve as <br />the responsible local government for <br />developing and operating solid waste <br />disposal facilities. <br />2. The county will study possible re- <br />source recovery methods and will <br />undertake approaches which prove to <br />be economically feasible. <br />C - solid waste disposal district <br />established <br />- new segment of landfill <br />developed <br />C - completed as part of solid <br />waste master plan <br />- solid waste recycling program <br />established by July 1, 1989 <br />to reduce volume <br />OBJECTIVES - F. TRANSPORTATION STATUS ACTIONS TAKEN <br />1. Develop an effective traffic circu C <br />lation system which meets existing <br />and anticipated needs of county <br />residents. <br />2. Provide adequate safety standards in C <br />the design of new and improved roadways. <br />3. Ensure the future roadway network is C <br />financially feasible. <br />A. Coordinate the traffic circulation sys- PC <br />ten with other transportation modes such <br />as bus, taxi, bikeways and rail. <br />5. Provide for adequate flexibility in the PC <br />design of new street construction or <br />or improvements. <br />22 <br />- adopted 1985 Major Street <br />and Highway Program <br />- prepared traffic circulation <br />study <br />- adopted 20 Year Transport- <br />ation Capital Improvements <br />Program (TCIP) <br />- Construction of Indian River <br />Blvd and Lindsey Road <br />- adopted state safety <br />guidelines <br />- adopted 5 year and 20 <br />year Transportation Capital <br />Improvements Programs (4CIP) <br />- adopted comprehensive <br />bikeway and sidewalk plan <br />- follow adopted state design <br />and construction guidelines <br />for R -O -W protection <br />- The county has acquired <br />over 67.32 square acres <br />(based upon thoroughfare <br />plan and does not include <br />internal subdivision roads) <br />of W1 since 1982 <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.