Laserfiche WebLink
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />North County RO SCADA Improvements <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the 1st day of March in the year 2022 <br />by and between Indian River County, a political subdivision of the State of Florida (hereinafter called <br />OWNER) and Paragon Electric of Vero, Inc. .(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified <br />or indicated in the Contract Documents and per Indian County Department of Utility Services <br />(IRCDUS) standards. The work is generally described as follows: <br />Construct electrical and SCADA system improvements at the North County RO Plant. <br />ARTICLE 2 ENGINEER <br />The North County RO SCADA Improvements project has been designed by Kimley-Horn and <br />Associates, Inc., hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume <br />all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the work in accordance with the Contract Documents. <br />t12 1[0I1111111�910► C_O091 & 12 <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Submit shop drawings for all materials and equipment to be utilized on the job. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of work. <br />5. Secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials and prepare the site. <br />7. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 31 calendar days to 250 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all mechanical, electrical, and control system <br />hardware/equipment and appurtenant items. <br />2. Perform all equipment start-ups and field testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br />00530-1 <br />