PROJECT NO IRC -2022
<br />4th Street Culvert Replacement at 90th Avenue
<br />Pay App No. 4
<br />SCHEDULED VALUE
<br />PREVIOUS APPLICATION
<br />THIS PERIOD
<br />Item No. UNIT QTY
<br />Unit Price Amount
<br />QUANTITY Amount
<br />QUANTITY Amount
<br />S 24.400.00
<br />24,400.00
<br />1.00
<br />24,400.00
<br />0.00
<br />101-1
<br />MOBIL IZATIOWDEMOBILIZATION
<br />LS
<br />1
<br />$ 4,80000
<br />4,800.00
<br />1.00
<br />4,800.00
<br />0.00
<br />102-1
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />PREVENTION, CONTROL AND ABATEMENT OF EROSION
<br />$ 4,00000
<br />4,00000
<br />100
<br />4,000.00
<br />0.00
<br />104-1
<br />AND WATER POLLUTION
<br />LS
<br />1
<br />$ 24,000 00
<br />24,000.00
<br />1.00
<br />24,000.00
<br />0.00
<br />104-2
<br />DEWATERING
<br />LS
<br />1
<br />MONITORING EXISTING STRUCTURES - INSPECTION AND
<br />$ 1,50000
<br />1,500.00
<br />0.75
<br />1,125.00
<br />0.25
<br />375.00
<br />108-1
<br />SETTLEMENT MONITORING
<br />LS
<br />1
<br />S 3,000.00
<br />3,000.00
<br />1.00
<br />3,000.00
<br />0.00
<br />110-1-1
<br />CLEARING AND GRUBBING
<br />LS
<br />_ 1
<br />$ 10.000.00
<br />10,000.00
<br />1.00
<br />10,000.00
<br />0.00
<br />120-1
<br />REGULAR EXCAVATION
<br />LS
<br />i
<br />$ 5.000 00
<br />5,000.00
<br />1.00
<br />5,000.00
<br />0.00
<br />120-6
<br />EMBANKMENT
<br />LS
<br />1
<br />$ 2500
<br />3,025.00
<br />121.00
<br />3,025.00
<br />0.00
<br />160-4
<br />TYPE B STABILIZATION 12- THICK, LBR 40
<br />SY
<br />121
<br />$ 3500
<br />4,235.00
<br />0.00
<br />0.00
<br />121.00
<br />4,235.00
<br />285-706
<br />OPTIONAL BASE, BASE GROUP 11 12' THICK LBR 100
<br />SY
<br />121
<br />$ 3,000 00
<br />3,00000
<br />1.00
<br />3,000.00
<br />0.00
<br />425-1-521
<br />INLETS, DT BOT, TYPE C. <19
<br />EA
<br />1
<br />$ 15600
<br />4.99200
<br />32.00
<br />4.992.00
<br />0.00
<br />430-174-112
<br />PIPE CULVERT, ROUND 12' SD PP CLASS 11 STORM
<br />LF
<br />32
<br />S 1.48000
<br />153,920.00
<br />93.60
<br />138,528.00
<br />10.40
<br />15,392.0(
<br />430-175-196
<br />PIPE CULVERT ROUND, 96- SICD RCP
<br />LF
<br />104
<br />S 124.00
<br />31,000.00
<br />250.00
<br />31,000.00
<br />0.00
<br />530-3-3
<br />RIPRAP, RUBBLE, F81 BANK AND SLOPE
<br />TN
<br />250
<br />$ 70.00
<br />2,800.00
<br />40.00
<br />2,800.00
<br />0.00
<br />530-3-4
<br />RIPRAP, RUBBLE. FSI, DITCH LINING
<br />TN
<br />40
<br />S 400
<br />1,000.00
<br />0.00
<br />0.00
<br />250.00
<br />1,000.00
<br />570-1-2
<br />PERFORMANCE TURF. SOD BAHIA
<br />SY
<br />250
<br />S 3,80000
<br />3,800.00
<br />0.00
<br />0.00
<br />1.00
<br />3,800.00
<br />999-1
<br />AS -BUILT DRAWING BY REGISTERED SURVEYOR
<br />LS
<br />1
<br />284,472.00
<br />259,670.00
<br />24,802.0(
<br />4th Street Culvert Replacement at 90th Avenue
<br />SUB TOTAL
<br />999-25
<br />FORCE ACCOUNT
<br />LS
<br />1
<br />50,000.00
<br />50,000.00
<br />0.00
<br />0.00
<br />TOTAL 334,472.00
<br />TOTAL 259,670.00
<br />TOTAL 24,80
<br />43 DAYS BEHIND SCHEDULE (SUBSTANTIAL COMPLETION DATE DECEMBER 9, 2021)
<br />SUBSTANTIAL COMPLETION DEADLINE (OCTOBER 27,2021)
<br />SUB -TOTAL MATER
<br />CALCULATED LIQUIDATED DAMAGES $50,310.00
<br />RE
<br />TOTAL CON
<br />! 3 71 -- &2
<br />A
<br />Richard B. SZyrka, P.E. Shane rry, President
<br />Public Works Director FloridaSite Contracting