Laserfiche WebLink
PROJECT NO IRC -2022 <br />4th Street Culvert Replacement at 90th Avenue <br />Pay App No. 4 <br />SCHEDULED VALUE <br />PREVIOUS APPLICATION <br />THIS PERIOD <br />Item No. UNIT QTY <br />Unit Price Amount <br />QUANTITY Amount <br />QUANTITY Amount <br />S 24.400.00 <br />24,400.00 <br />1.00 <br />24,400.00 <br />0.00 <br />101-1 <br />MOBIL IZATIOWDEMOBILIZATION <br />LS <br />1 <br />$ 4,80000 <br />4,800.00 <br />1.00 <br />4,800.00 <br />0.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />PREVENTION, CONTROL AND ABATEMENT OF EROSION <br />$ 4,00000 <br />4,00000 <br />100 <br />4,000.00 <br />0.00 <br />104-1 <br />AND WATER POLLUTION <br />LS <br />1 <br />$ 24,000 00 <br />24,000.00 <br />1.00 <br />24,000.00 <br />0.00 <br />104-2 <br />DEWATERING <br />LS <br />1 <br />MONITORING EXISTING STRUCTURES - INSPECTION AND <br />$ 1,50000 <br />1,500.00 <br />0.75 <br />1,125.00 <br />0.25 <br />375.00 <br />108-1 <br />SETTLEMENT MONITORING <br />LS <br />1 <br />S 3,000.00 <br />3,000.00 <br />1.00 <br />3,000.00 <br />0.00 <br />110-1-1 <br />CLEARING AND GRUBBING <br />LS <br />_ 1 <br />$ 10.000.00 <br />10,000.00 <br />1.00 <br />10,000.00 <br />0.00 <br />120-1 <br />REGULAR EXCAVATION <br />LS <br />i <br />$ 5.000 00 <br />5,000.00 <br />1.00 <br />5,000.00 <br />0.00 <br />120-6 <br />EMBANKMENT <br />LS <br />1 <br />$ 2500 <br />3,025.00 <br />121.00 <br />3,025.00 <br />0.00 <br />160-4 <br />TYPE B STABILIZATION 12- THICK, LBR 40 <br />SY <br />121 <br />$ 3500 <br />4,235.00 <br />0.00 <br />0.00 <br />121.00 <br />4,235.00 <br />285-706 <br />OPTIONAL BASE, BASE GROUP 11 12' THICK LBR 100 <br />SY <br />121 <br />$ 3,000 00 <br />3,00000 <br />1.00 <br />3,000.00 <br />0.00 <br />425-1-521 <br />INLETS, DT BOT, TYPE C. <19 <br />EA <br />1 <br />$ 15600 <br />4.99200 <br />32.00 <br />4.992.00 <br />0.00 <br />430-174-112 <br />PIPE CULVERT, ROUND 12' SD PP CLASS 11 STORM <br />LF <br />32 <br />S 1.48000 <br />153,920.00 <br />93.60 <br />138,528.00 <br />10.40 <br />15,392.0( <br />430-175-196 <br />PIPE CULVERT ROUND, 96- SICD RCP <br />LF <br />104 <br />S 124.00 <br />31,000.00 <br />250.00 <br />31,000.00 <br />0.00 <br />530-3-3 <br />RIPRAP, RUBBLE, F81 BANK AND SLOPE <br />TN <br />250 <br />$ 70.00 <br />2,800.00 <br />40.00 <br />2,800.00 <br />0.00 <br />530-3-4 <br />RIPRAP, RUBBLE. FSI, DITCH LINING <br />TN <br />40 <br />S 400 <br />1,000.00 <br />0.00 <br />0.00 <br />250.00 <br />1,000.00 <br />570-1-2 <br />PERFORMANCE TURF. SOD BAHIA <br />SY <br />250 <br />S 3,80000 <br />3,800.00 <br />0.00 <br />0.00 <br />1.00 <br />3,800.00 <br />999-1 <br />AS -BUILT DRAWING BY REGISTERED SURVEYOR <br />LS <br />1 <br />284,472.00 <br />259,670.00 <br />24,802.0( <br />4th Street Culvert Replacement at 90th Avenue <br />SUB TOTAL <br />999-25 <br />FORCE ACCOUNT <br />LS <br />1 <br />50,000.00 <br />50,000.00 <br />0.00 <br />0.00 <br />TOTAL 334,472.00 <br />TOTAL 259,670.00 <br />TOTAL 24,80 <br />43 DAYS BEHIND SCHEDULE (SUBSTANTIAL COMPLETION DATE DECEMBER 9, 2021) <br />SUBSTANTIAL COMPLETION DEADLINE (OCTOBER 27,2021) <br />SUB -TOTAL MATER <br />CALCULATED LIQUIDATED DAMAGES $50,310.00 <br />RE <br />TOTAL CON <br />! 3 71 -- &2 <br />A <br />Richard B. SZyrka, P.E. Shane rry, President <br />Public Works Director FloridaSite Contracting <br />