My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-015
CBCC
>
Resolutions
>
2020's
>
2022
>
2022-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2022 10:20:53 AM
Creation date
4/6/2022 12:25:33 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2022-015
Approved Date
03/08/2022
Agenda Item Number
8.D.
Resolution Type
Authorizing FDOT Agreement
Entity Name
Florida Department of Transportation (FDOT
Subject
Small County Outreach Program (SCOP) Agreement
Area
CR-603/Indian River Boulevard from Merrill Barber Bridge to 53rd Street.
Document Relationships
2022-048
(Agenda)
Path:
\Official Documents\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2022- 015 <br />RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, <br />AUTHORIZING THE CHAIRMAN'S EXECUTION OF SMALL COUNTY OUTREACH PROGRAM (SCOP) <br />AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION (MILLING <br />AND RESURFACING) AND CONSTRUCTION ENGINEERING INSPECTION (CEI) SERVICES OF CR-603/INDIAN <br />RIVER BOULEVARD FROM MERRILL BARBER BRIDGE TO 53RD STREET. <br />WHEREAS, the milling and resurfacing of CR-603/Indian River Boulevard from Merrill Barber <br />Bridge to 53rd Street is an Indian River County priority project; and <br />WHEREAS, the Florida Department of Transportation (FDOT) is prepared to provide funds to <br />pay a portion of the cost for the construction (milling and resurfacing) and CEI of CR-603/Indian River <br />Boulevard from Merrill Barber Bridge to 53rd Street as well as widening the shoulder to guarantee a <br />minimum 5 -foot -wide bike lane along a major North/South corridor, ADA sidewalk return <br />improvements and interconnect improvements for hardening and resiliency under the Small County <br />Outreach Program (SCOP); and <br />WHEREAS, the Indian River County Board of County Commissioners is responsible for paying 25 <br />percent or more of the cost of the total project costs as its portion of the required local match. <br />NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN <br />RIVER COUNTY, FLORIDA, that the Chairman of the Board is hereby authorized to make, execute, and <br />deliver to the State of Florida, Department of Transportation, a Small County Outreach Program <br />Agreement for the aforementioned project. <br />The foregoing resolution was offered by Commissioner Adams who moved its adoption. The <br />motion was seconded by Commissioner Flescher and, upon being put to a vote, the vote was as <br />follows: <br />Chairman Peter D. O'Bryan <br />AYE <br />Vice -Chairman Joe Earman <br />AYE <br />Commissioner Susan Adams <br />AYE <br />Commissioner Joseph E. Flescher <br />AYE <br />Commissioner Laura Moss <br />AYE <br />The Chairman thereupon declared the resolution passed and adopted this 8th day of <br />March 2022. <br />Attest: Jeffrey R. Smith, Clerk of Court <br />and Comptroller n <br />By: <br />Deputy Clerk <br />F"—to <br />rmWency <br />William K. Deb aal, Deputy County Attorney <br />BOARD OF COUNTY COMMISSIONERS <br />OF INDIoT RAVERCOUNTY, FLORIDA <br />By /Z -CC=s, �4, c <br />Peter D. O'Bryan, Chair n <br />S i A ITE OF FLOFfl uA <br />INDIAN RIVER COUNTY <br />THIS IS TO CERTIFY THAT THIS IS A TRUE AND CORRECT <br />COPY OF THE ORIGINAL ON FILE IN THIS OFFICE. <br />BY'S <br />DATE <br />JEFJRiKR. SMITH,CLER <br />FA\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\l- <br />Admin\Agenda Items\FDOT\SCOP Approval\Authorizing Resolution.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.