My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. If the proper execution or results of any part of <br />CONTRACTOR's Work depends upon work per- <br />formed by others under this Article 7, CONTRACTOR <br />shall inspect such other work and promptly report tic <br />ENGINEER in writing any delays, defects, or deficien- <br />cies in such other work that render it unavailable or <br />unsuitable for the proper execution and results of <br />CONTRACTOR's Work. CONTRACTOR's failure to <br />so report will constitute an acceptance of such other <br />work as fit and proper for integration with <br />CONTRACTOR's Work except for latent defects and <br />deficiencies in such other work. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for <br />the performance of other work on the Project at the <br />Site, the following will be set forth in Supplementary <br />Conditions: <br />1. the individual or entity who will have <br />authority and responsibility for coordination of <br />the activities among the various contractors will <br />be identified; <br />2. the specific matters to be covered by <br />such authority and responsibility will be <br />itemized; and <br />3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract <br />Documents shall be that of the former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required of OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements, Reports and Tests <br />A. OWNER's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br />identifying and making available to CONTRACTOR <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br />8,07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders as indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in <br />paragraph 13.03.13. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the <br />Work. OWNER will not be responsible for <br />CONTRACTOR's failure to perform the Work in <br />accordance with the Contract Documents. <br />00700 - General Conditions <br />00700-27 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovatons\1-Admin',Bids\Bid Documents\Rebid\00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.