My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later tha-i <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for iterris <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. If ENGINEER sE)Rsiders the We, -'k. <br />Substantially-Gemplete, ENGINEER Wil ffepaFe Rd <br />d liv to OWNER a tentative zcrcn'fGane-ef Substantial <br />Completion which shall fix the date of Substan�ial <br />Gempletien. . he Fe shall be attached to the eertifii <br />befere final payment OWNER shall have seven da -,S <br />make—wFltten jeetieR to ENGINEER ashy <br />pr©�fisief�s of the certi''cato attached list. I <br />— f, afteF <br />GORsider'ng such objections. ENGINEER conclr i <br />that the Wi is RE)t substaRtially—Gem,ple: <br />ENGINEER will within 14 days after submission of the <br />tentative Gert'fiGateto OWNER n!<tify CONTRACTORin writing, statiRg� the —reersef}s theFefiIf, a=te,= <br />Gens-rlorat'o of OWNER's ebie0i ENGINEER <br />ENGINEER will within said 'a r4 days exei and <br />ertmfm.-ate of Substantial Completion (with a Fevised <br />tentative list of items to be e nleted n orrected) <br />reflecting s,Gh ehanoes from the tentative eert'fcate <br />as ENGINEER believesjustified after G s'aerat'o of <br />any objectii fFE)Fn OWNER. At the time ' d-lil-IJ <br />of the tentative Certificate 9f c„bStar,tial Qgmpletien <br />ENGINEER will deliver to OWNER and GONITRAG <br />respensibil+ties pe„diRg final payment beton <br />OWNER and CONTRACTOR with r eet to s ,rit" <br />opeFation,— safety, —and preteEtie of the Wik, <br />mainteRaRGi heat utilities,iRsuFanee, nrl , ant,es <br />and guarantees. IJIl2ss OWNER aR-1 <br />GONTRAGTOR ai ether se ifa WlPitiRg and <br />iss, n the definitive certifieate of Substantial Gemnle <br />tion EN GINEER's aforesaid r eRdat'e will he <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify <br />OWNER and ENGINEER in writing that <br />CONTRACTOR considers any such part of the <br />Work ready for its intended use and substan- <br />tially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that <br />part of the Work. Within a reasonable time <br />after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make <br />an inspection of that part of the Work to <br />determine its status of completion. If <br />ENGINEER does not consider that part of the <br />Work to be substantially complete, ENGINEER <br />will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefor. If <br />ENGINEER considers that part of the Work to <br />be substantially complete, the provisions of <br />paragraph 14.04 will apply with respect to <br />certification of Substantial Completion of that <br />part of the Work and the division of <br />responsibility in respect thereof and access <br />thereto. <br />00700 - General Conditions <br />00700-40 <br />F\Public Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\Bids\Bid Documents\Rebid\00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.