SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: JACKIE ROBINSON TRAINING COMPLEX TICKET OFFICE BUILDING <br />RENOVATIONS <br />OWNER's Project No. IRC -2020 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />Q Unit Prices <br />II Lump Sum <br />FJ Other: <br />❑ By Change Order: <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />Ll Engineer's Records <br />❑ Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date: <br />" END OF SECTION <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\13ids\Bid <br />Documents\Rebid\00948 - Work Change Directive Rev 06-2013.doc <br />