My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. <br />Maintain these during the entire period of construction under this <br />Contract for the use of all construction personnel on the job. <br />Provide enough chemical toilets to conveniently serve the needs of <br />all personnel. Properly seclude toilet facilities from public <br />observation. <br />2. Chemical toilets and their maintenance shall meet the requirements <br />of State and local health regulations and ordinances. Immediately <br />correct any facilities or maintenance methods failing to meet these <br />requirements. Upon completion of work, remove the facilities from <br />the premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically required as a part of the Contract, but <br />the CONTRACTOR shall provide inspection of work area daily and shall take <br />whatever measures are necessary to protect the safety of the public, workmen, <br />and materials, and provide for the security of the site, both day and night. <br />1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work <br />of this Contract. In dry weather, spray dusty areas daily with water in order to <br />control dust. Take necessary steps to prevent the tracking of mud onto adjacent <br />streets and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary Facilities, services, and controls and legally <br />dispose of them as soon as the work is complete. The areas of the site used for <br />temporary facilities shall be properly reconditioned and restored to a condition <br />acceptable to the OWNER. <br />+ + END OF SECTION + + <br />01520-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\Bids\Bid <br />Documents\Rebid\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.