My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />B. Do not store or park materials or equipment within the drip line of trees that are <br />to remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas <br />subject to traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order <br />to maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious <br />materials in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the <br />cut or damaged areas with emulsified asphalt compounded specifically for <br />horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />Coordinate Work in this Section with requirements of other sections herein. <br />1_4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by <br />construction activities. The CONTRACTOR shall repair any irrigation systems <br />damaged by construction activities within two (2) days. The CONTRACTOR shall <br />be responsible for maintaining the functionality of the remaining portion of the <br />system if it should fall outside of the right-of-way. <br />1.5 PROTECTION OF EXISTING STRUCTURES <br />A. Underground Structures: <br />1. Underground structures are defined to include, but not be limited to, all <br />sewer, water, gas, and other piping, and manholes, chambers, electrical <br />conduits, tunnels and other existing subsurface work located within or adja- <br />cent to the limits of the Work. <br />2. All underground structures known to ENGINEER except service <br />connections for water, sewer, electric, and telephone are shown. <br />01541-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\Bids\Bid Documents\Rebid\01541 <br />- Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.