Laserfiche WebLink
SECTION 00458 - LIST OF SUBCONTRACTORS <br />The Bidder MUST list below the name and address of each Subcontractor who will perform <br />work under this Contract in excess of one-half percent of the total bid price, and shall also list <br />the portion of the work which will be done by such Subcontractor. After the opening of Bids, <br />additions, changes or substitutions will not be allowed unless approved by Indian River County <br />after a request for such a change has been submitted in writing by the Contractor, which shall <br />include reasons for such request. Subcontractors must be properly licensed and hold a valid <br />Certificate of Competency. <br />Documentation Submitted with Project No. IRC -2020 for JACKIE ROBINSON TRAINING <br />COMPLEX TICKET OFFICE BUILDING RENOVATIONS <br />Note: Attach additional sheets if required. <br />END OF SECTION <br />00458 • List of Subcontractors REV 3-1 BA <br />.30458- 1 <br />F1Pubtic WorksIENGINEERING DIVISION PROJECT512020 JRTC Ticke Office Renovatlonsil-Adrran0dMBid DocumenulRebiM00458 -List or Subcontractors REV 3. <br />18A.doc <br />Work to be Performed <br />Subcontractor's Name/Address <br />Portion of Work o' <br />1. <br />Ceiling Tile <br />A-1 Acoustical Ceiling <br />7% <br />2. <br />Electric <br />M.C.S.1, Electrical Contracting <br />4% <br />3. <br />Plumbing <br />Meek & Sons Plumbing, Inc <br />5% <br />4. <br />Painting <br />Bucio Painting <br />7% <br />5. <br />Mechanical <br />David Heating & Air Conditioning, Inc. <br />4% <br />6. <br />Drywall <br />Delta Drywall <br />1% <br />7. <br />a. <br />s. <br />10. <br />11. <br />12, <br />13. <br />14. <br />Note: Attach additional sheets if required. <br />END OF SECTION <br />00458 • List of Subcontractors REV 3-1 BA <br />.30458- 1 <br />F1Pubtic WorksIENGINEERING DIVISION PROJECT512020 JRTC Ticke Office Renovatlonsil-Adrran0dMBid DocumenulRebiM00458 -List or Subcontractors REV 3. <br />18A.doc <br />