My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calendar days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />OWNER:- <br />CONTRACTOR:- <br />The <br />WNER:CONTRACTOR: <br />The following documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other specifically <br />noted conditions precedent to achieving Substanrial Completion as required by Contract Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents nor is it a release of CONTRACTOR's obligation to complete the Work in <br />accordance with the Contract Documents. <br />Executed by ENGINEER on: <br />ENGINEER: <br />M <br />(Authorized Signature) <br />(Date). <br />CONTRACTOR accepts this Certificate of Substantial Completion on (date). <br />CONTRACTOR: <br />0 <br />(Authorized Signature) <br />OWNER accepts this Certificate of Substantial Completion on (date). <br />OWNER: INDIAN RIVER COUNTY <br />(Authorized Signature) <br />* * END OF SECTION * * <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\Bids\Bid Documents\Rebid\00630 - Certificate of Substantial <br />Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.