Laserfiche WebLink
20-0240 - Hallstrom Conservation Area COA Management-ADD1 <br />#REFI ADMIN INSPECTOR TECH ENG PIM TOTAL COSTS <br />Project Information - $ - <br />Maps $ <br />Site Plan Info $ - <br />Field $ <br />02 -CONCEPTS CONCEPTUAL DRAWINGS <br />Concept Plan 1 $ - <br />Client Coordination $ <br />Concept Plan 2 $ - <br />03-PREMEET PRELIMINARY MEETINGS <br />Client Coordination $ - <br />Pre -APP $ <br />Follow up meeting $ <br />04-SUBCOORD SUB -CONSULTANT COORDINATION <br />Geotechnical Coordination $ - <br />Traffic Coordination $ <br />Environmental Coordination $ <br />Survey Coordination ; $ - <br />Landscape Coordination ! $ <br />Architectural Coordination $ <br />Misc Sub Coordination $ - <br />$ <br />$ <br />0S-SITEDES SITE DESIGN PLANS <br />Site Dimensional Plan(s) $ Site Data $ - <br />General Notes/ Details $ - <br />Vehicular Circulation Plan $ - <br />ArchitecturalCoord $ <br />Survey Coord $ - <br />Revisions per Agency Comments $ - <br />Progress meetings $ <br />06 -PGD <br />Proposed Surface Rough Grade <br />Preliminary Storm Layout <br />SWPPP Plans <br />Grading Plans <br />Drainage Plans <br />Cross Sections <br />Grading Details <br />Stormwater Calcs/ Report <br />Revisions per Agency Comments <br />Progress meetings <br />$ <br />