Laserfiche WebLink
Weekly progress meetings <br />Schedule coordination <br />Inspections <br />Site Visit <br />Site Changes/ subcontr. coord. <br />Final Certifications <br />Miscellaneous <br />ADMIN INSPECTOR TECH <br />ENG PM <br />TOTAL <br />COSTS <br />52 <br />8 <br />60 <br />$ <br />7,380.00 <br />12 <br />i 22 <br />34 <br />$ <br />5,230.00 <br />3 <br />8 <br />11 <br />$ <br />1,745.00 <br />12.2778 8 <br />12 <br />32.2778 <br />$ <br />4,125.00 <br />8 <br />8 <br />16 <br />$ <br />2,320.00 <br />- <br />12.2778 83 <br />58 <br />153.2778 <br />$ <br />20,800.00 <br />SUMMARY <br />DEVELOPMENT HOURS AND COSTS (WITH CONSTRUCTION) <br />ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />Total 19.5 Hr 133.0 Hr 12.0 Hr 134.0 Hr 287.5 Hr $ 427300.00 <br />Comparative numbers <br />Estimated construction cost: (construction costs of discipline) <br />% design fees (ASCE comp curve) 5.50% <br />Calculated Design fee $ - <br />Rev Date: 2022-03-08 <br />