My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-055
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 1:31:58 PM
Creation date
4/7/2022 1:30:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/15/2022
Control Number
2022-055
Agenda Item Number
8.H
Entity Name
MBV Engineering, Inc.
Subject
Amendment No. 2 to Work Order No. 18
Hallstrom House (FTC No.: 01-055-FF1)
Hallstrom Farmstead Conservation Area Public Use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPMENT HOURS AND COSTS (WITH CONSTRUCTION) <br />ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />Total 14.5 Hr 43.0 Hr 26.2 Hr 35.0 Hr 118.7 Hr $ 16,300.00 <br />Comparative numbers <br />Estimated construction cost: (construction costs of discipline) <br />% design fees (ASCE comp curve) 5.50% <br />Calculated Design fee $ - <br />Rev Date: 2020-11-05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.