Laserfiche WebLink
The top 20 regional transportation projects are shown below. <br />Kings Krphway from North of 1.95 Overpass to <br />Inddo Road - Widen 2 to 4L <br />71 <br />f <br />t ►'oft Sl Lucie Boulevard from PaarDrNeb <br />' Darwin Boulevard- Widen 2 to 4L <br />2 <br />' <br />Roseland Rood from CR 512 to US i <br />- Widen 2 to 41. <br />12 <br />Roseland Road from CR 512 to IJ.S / - <br />8hke Lanes/Sa:lawa&s <br />l.._...._.__........_._.-.�._... <br />3 <br />----- - -- - - — <br />US 1 from Cove Road b Indian Rrver County/ <br />13 <br />Indian Street ffrxn SR 761<anner lighwair to <br />Wilb Boulevard- Widen S to 6L - <br />u9�Y <br />Brevard County Line - Comdor Retrofit <br />_. <br />LtS 1 Bus Rapid Transit from Hobe Sound to <br />14 <br />_.. ... <br />66 Avenue horn 49 Street to Barber Sired - <br />Widen 2 to 4L <br />r <br />Sebastian - Transit <br />_- "-'-"-`-°' <br />.. � <br />75 <br />43 Avenue from 25 Street SW to 26 Street - <br />77 <br />( Bike LaneslSdewalks <br />^------_.___�_.__ <br />from 1-95toCR S LO - Wden 4 So 5L <br />F-1 <br />16 <br />ofBridge Road to S of <br />fH?qhf11�adowsA,enue-Widen 6 to 8L <br />�jjjrrr/ <br />St. Lucie West Boulevard from E of 1-95 b <br />Cssh mese Bowe vs rd -Widen 4 to 6L <br />17 <br />_ <br />" <br />1-95 d Northem Connector- New Interchange <br />7 <br />btdway Road from Glades Cut OR Road to <br />Setvrtz Road - Widen 2 b 4L <br />^ w <br />18 <br />-- c <br />t I-95 from N of Becker Road to Nof <br />Glades Cut Off Road - Widen 6 too SL <br />n \ <br />7 Street- Widen to 5L <br />(Indian Rrver Boulevard from US 1 : 4 Street b <br />17T9> <br />- <br />[21 Avenuefrom LLucie County Lmeto <br />OsRoad - Widen 2 to 4L <br />►� <br />�—lllfff/ <br />Glades Cut Off Road from Commerce Center <br />Drive to SeMdz Road- Widen 2 to 4LN, <br />7,,n Highway from Ctrus Bhwlwrnd <br />SR1NMaSVM <br />Florida Turnpike - Brke Lanes <br />10 <br />Pon St. Lucie Boulevard from Becker Road to <br />Paar Dnve - Widen 2 to 4L <br />20 <br />' <br />CR 512 from Y1hbw Street to 1-95-1, den 2 to 1� <br />MEMORANDUM OF UNDERSTANDING BETWEEN <br />THE MARTIN METROPOLITAN PLANNING ORGANIZATION, THE <br />INDIAN RIVER :METROPOLITAN PLANNING ORGANIZATION AND THE <br />ST. LUCIE TRANSPORTATION PLANNING ORGANIZATION <br />4h <br />This Memorandum of Understanding is entered into on the �_ day of <br />2021, by and between the Mai -tin Metropolitan Planning Organization <br />( ereinafter referred to as "MMPO"), the Indian River Metropolitan Planning <br />Organization (hereinafter referred to as "IRMPO") and the St. Lucie Transportation <br />Organization (herein referred to as "TPO"), all constituting a public agency as <br />defined in Part I of Chapter 163, Florida Statutes. <br />WITNESSETH: <br />Whereas the Sebastian/Vero Beach Urbanized Area (represented by the <br />Indian River MPO) and the Port St. Lucie Urbanized Area (represented by the St. <br />Lucie TPO and Martin MPO) have, as a result of the 2010 Census, been determined <br />to be contiguous to one another; and <br />Whereas, the three parties have agreed to cooperate in the development of a <br />2045 Regional Long Range Transportation Plan (R.LRTP) for Martin, St. Lucie and <br />Indian River counties; and <br />