Laserfiche WebLink
SEAGRAPE TRAIL BEACH PARK LICENSE AGREEMENT <br />Indian River County ("County") hereby authorizes Baytree Condominium Association, <br />Inc. and its affiliates, agents, representatives and contractors (collectively "Licensee") to <br />use the established beach access point at Seagrape Trail Park ("Park") for the limited <br />purpose of delivering beach material and accessing the beach with certain heavy equipment <br />to perform dune stabilization projects for Licensee's property. Use of the Park for this <br />purpose is limited to five (5) days between March 15, 2021 and March 19, 2021 between <br />the hours of 7:30 AM — 5:30 PM (the "License Period"), and is subject to the following <br />terms and conditions: <br />1) Licensee shall operate all equipment, or cause all equipment to be operated, in a <br />safe and prudent manner, and in accordance with any measures deemed necessary <br />for public safety by County staff. <br />2) Licensee shall (a) keep the gates to the Park securely locked at all times except <br />when opened for the passage of Licensee's equipment, (b) manage in a timely and <br />efficient manner any traffic issues that arise as a result of Licensee's use of the <br />Park, and (c) prohibit any public vehicular or pedestrian use of the Park during <br />Licensee's dune stabilization activities. Licensee shall post "Beach Closed" signs <br />at the Park entrance during Licensee's activities. <br />3) Any sand needed to establish a "sand ramp" for equipment to access the beach, or <br />to perform the dune stabilization projects for the nearby residential developments, <br />shall be provided by Licensee. No use of existing sand from the Park or beach shall <br />be allowed. Any damage by Licensee to the Park shall be repaired to the satisfaction <br />of the County and at no cost to the County. The agreed upon access route shall be <br />inspected/videoed by County staff with the Licensee present, prior to equipment <br />mobilization to the identified Beach Park. Upon completion of the project and prior <br />to de -mobilizing the licensee shall configure the "sand ramp" to the meet the profile <br />of the County's prescribed dune profile for Seagrape Trail. <br />4) Licensee shall plant County approved dune material once the dune is reconfigured <br />to meet the County's prescribed dune profile. The materials and the method of <br />planting such materials shall be reviewed and approved by the County prior to <br />installation. <br />5) Licensee shall maintain 100% survival for an establishment period of fourteen (14) <br />days after planting during the maintenance period. Licensee shall be responsible <br />for all costs associated with dune plant replacement for a warranty period of 90 <br />days. During this warranty period, the planting areas must maintain a minimum <br />survival rate of 90% of all planting units installed. Failure to ensure the <br />survivability of planting during the 90 -day warranty period will be a consideration <br />for approval of any future request for access to perform maintenance projects. <br />