Laserfiche WebLink
20-0240 - Hallstrom Conservation Area COA Management-ADD1 <br />#REF! <br />ADMIN INSPECTOR TECH ENG <br />PM TOTAL COSTS <br />$ - <br />$90 $115 $115 $150 <br />$175 <br />01 -RESEARCH <br />PROJECTSETUP <br />$ - <br />Project Information <br />- <br />$ - <br />Maps <br />$ <br />Site Plan Info <br />$ <br />Field <br />$ <br />Grading Details <br />$ - <br />Stormwater Calcs/ Report <br />$ - <br />Revisions per Agency Comments <br />$ - <br />02 -CONCEPTS <br />CONCEPTUAL DRAWINGS <br />$ - <br />Concept Plan 1 <br />$ - <br />Client Coordination <br />$ <br />Concept Plan 2 <br />$ - <br />03-PREMEET <br />PRELIMINARY MEETINGS <br />Client Coordination <br />$ - <br />Pre -App <br />$ - <br />Follow up meeting <br />$ - <br />$ - <br />SWPPP Plans <br />$ - <br />Grading Plans <br />04-SUBCOORD <br />SUB -CONSULTANT COORDINATION <br />Geotechnical Coordination <br />Traffic Coordination <br />Environmental Coordination <br />Survey Coordination <br />Landscape Coordination <br />Architectural Coordination <br />Misc Sub Coordination <br />05-SITEDES SITE DESIGN PLANS <br />Site Dimensional Plan(s) <br />Site Data <br />General Notes/ Details <br />Vehicular Circulation Plan <br />Architectural Coord <br />Survey Coord <br />Revisions per Agency Comments <br />Progress meetings <br />06 -PGD <br />PAVING & GRADING PLANS <br />Proposed Surface Rough Grade <br />$ - <br />Preliminary Storm Layout <br />$ - <br />SWPPP Plans <br />$ - <br />Grading Plans <br />$ - <br />Drainage Plans <br />$ - <br />Cross Sections <br />$ - <br />Grading Details <br />$ - <br />Stormwater Calcs/ Report <br />$ - <br />Revisions per Agency Comments <br />$ - <br />Progress meetings <br />$ - <br />79 <br />