Laserfiche WebLink
ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />12 -CONST <br />CONSTRUCTION SERVICES <br />Weekly progress meetings <br />$ <br />- <br />Schedule coordination <br />$ <br />Inspections <br />52 <br />8 <br />60 <br />$ <br />7,380.00 <br />Site Visit <br />12 <br />22 <br />34 <br />$ <br />5,230.00 <br />Site Changes/ subcontr. coord. <br />3 <br />8 <br />11 <br />$ <br />1,745.00 <br />Final Certifications <br />12.2778 <br />8 <br />12 <br />32.2778 <br />$ <br />4,125.00 <br />Miscellaneous <br />8 <br />8 <br />16 <br />$ <br />2,320.00 <br />12.2778 <br />83 <br />58 <br />153.2778 <br />$ <br />20,800.00 <br />SUMMARY <br />DEVELOPMENT HOURS <br />AND COSTS (WITH CONSTRUCTION) <br />ADMIN <br />INSPECTOR <br />TECH ENG <br />PM <br />TOTAL <br />COSTS <br />Total <br />19.5 Hr <br />133.0 Hr <br />12.0 Hr <br />134.0 Hr <br />287.5 Hr <br />$ <br />42,300.00 <br />Comparative numbers <br />Estimated construction cost: <br />(construction costs of discipline) <br />design fees (ASCE comp curve) <br />5.50% <br />Calculated Design fee <br />$ - <br />Rev Date: 2022-03-08 <br />81 <br />