My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2022
CBCC
>
Meetings
>
2020's
>
2022
>
03/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 10:44:27 AM
Creation date
4/21/2022 10:18:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />12 -CONST <br />CONSTRUCTION SERVICES <br />Weekly progress meetings <br />$ <br />- <br />Schedule coordination <br />$ <br />Inspections <br />52 <br />8 <br />60 <br />$ <br />7,380.00 <br />Site Visit <br />12 <br />22 <br />34 <br />$ <br />5,230.00 <br />Site Changes/ subcontr. coord. <br />3 <br />8 <br />11 <br />$ <br />1,745.00 <br />Final Certifications <br />12.2778 <br />8 <br />12 <br />32.2778 <br />$ <br />4,125.00 <br />Miscellaneous <br />8 <br />8 <br />16 <br />$ <br />2,320.00 <br />12.2778 <br />83 <br />58 <br />153.2778 <br />$ <br />20,800.00 <br />SUMMARY <br />DEVELOPMENT HOURS <br />AND COSTS (WITH CONSTRUCTION) <br />ADMIN <br />INSPECTOR <br />TECH ENG <br />PM <br />TOTAL <br />COSTS <br />Total <br />19.5 Hr <br />133.0 Hr <br />12.0 Hr <br />134.0 Hr <br />287.5 Hr <br />$ <br />42,300.00 <br />Comparative numbers <br />Estimated construction cost: <br />(construction costs of discipline) <br />design fees (ASCE comp curve) <br />5.50% <br />Calculated Design fee <br />$ - <br />Rev Date: 2022-03-08 <br />81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.