Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project consists of rebuilding walls that have been demolished during <br />mold remediation activities, interior upgrades for ADA accessibility, and additional mold <br />remediation. The project shall provide a "turn key ready to occupy facility" upon <br />completion. The main improvements include drywall removal, replacement and finishing, <br />wall relocations, removal and replacement of floor coverings, removal and replacement <br />of ceiling grid and tiles, replacement of plumbing, fixtures, tile work in showers and <br />restrooms, grading and landscaping improvements. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: JACKIE ROBINSON TRAINING COMPLEX TICKET OFFICE <br />BUILDING RENOVATIONS <br />County Project Number: IRC -2020 <br />Bid Number: 2022026 <br />Project Address: 4007 26TH Street, Vero Beach, FL 32960 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />41 <br />