My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/21/1995
CBCC
>
Meetings
>
1990's
>
1995
>
9/21/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:12 PM
Creation date
6/16/2015 2:57:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
09/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Exemption in the length of time allowed to mine the sand <br />pit; <br />2) Increase the water depth allowed within a created <br />water body to 30 feet (instead of 12 feet). <br />Mr. Luethje distributed the following letter with attached <br />information: <br />(.;.-kRTER ASSOCIATES, INC:. <br />t:ONSUJING ENGINEERS AND LAND SURVE-110RS <br />1709 3151 STREET <br />ITIM BEACI1. Pt. 32960-3472 <br />407.1,61.71911 WAX) <br />August 28, 1995 <br />Mr. Stan Boling, Director <br />Indian River County Planning <br />1840 25th Street <br />Vero Beach, FL 32960. <br />RE: Workshop on County Mining Regulations <br />Dear Stan: <br />Thank you for the notice of the workshop on mining and excavation. <br />MARVIN 17. CARTlat. lt.l..ti <br />DANA 110WARU. H.L.S. <br />DEAN t . I.l'F.'1'tI IF.. P.I.. <br />IMFN 11. 81.1'x.. I1.1 <br /><;tit)1t1;1�: ti1�11)Xti. P.li. <br />�il1i\'liti\t11tI.Ft(�I[H. Y.P <br />l'\'Itilt .k S. \'.\1:1111-.1{. III <br />In an attempt to help address the need for additional stormwater detention and treatment, <br />flood plain displacement problems and irrigation management needs within Indian River <br />County, due to its close proximity to the Indian River Lagoon, and to help some existing <br />developments economically improve on these functions, we request that consideration be <br />given to revise, the section on excavation incidental to development permits, Chapter 934 <br />Section 934.04 (7)(b) to allow for: <br />1. That excavation be allowed to be incidental to an authorized site plan for <br />stormwater detention and treatment, flood plain displacement problems and <br />irrigation management needs; <br />2. A time certain be set for completion of each site plan and that the site work be <br />monitored by an engineer or county staff to assure that if the total site work can not <br />be accomplished within the designated time, then the project size could be reduced <br />and completed in an aesthetically pleasing manner. Progressive phases of the <br />project shall be shown and approved on the original site plan which will allow this <br />reduction to occur in an orderly manner. <br />A time extension of the project would be subject to subsequent site plan approval. <br />3. Allow for 30 feet depth of the water body. <br />It is our opinion that: <br />1. There is a need to improve stormwater management, flood plain displacement, and <br />irrigation water retention in the county and therefore the opportunity for the <br />development of lakes, etc. be expanded and <br />13 BOOK 96 F'Ai;F 9(Jt <br />SEPTEMBER 21, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.