My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/08/2022
CBCC
>
Meetings
>
2020's
>
2022
>
03/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:54:04 AM
Creation date
4/28/2022 11:43:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/08/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />No. 1 <br />PROJECT: North County Water Treatment Plant Well N7 Formation Water Disposal Measures and <br />Gopher Tortoise Management <br />DATE OF ISSUANCE March 2022 EFFECTIVE DATE March 2022 <br />OWNER Indian River County <br />OWNER's Contract No. Agreement Dated July 13, 2021 Project No. 044572103 <br />CONTRACTOR All Webbs Enterprises, Inc. ENGINEER Kimley-Horn and Associates <br />You are directed to make the following changes in the Contract Documents: <br />Description: Install 800 linear feet of silt fence and pipe ramps for gopher tortoise management; add <br />turbidity controls to formation water disposal to meet 0 NTU above background in G7 canal (in <br />accordance with IRFWCD Discharge permit No. 22-07). Modify configuration to blend discharge with raw <br />water, add settling tanks, add floc logs, furnish dissipation structure in canal (install by owner). Change <br />Order 1 includes an increase in contract price for Well N7 ($92,435) and a net reduction of the total <br />Contract Price for work not performed on Well S1 ($211,465). <br />Reason for change order: Meet discharge peri --it requirements for IRFWCD and FWC permit <br />requirements for gopher tortoise relocation. <br />Attachments: (List documents supporting change) <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times <br />$ 992 100.00 <br />Substantial Completion: 270April 9, 2022 _ <br />Ready for final payment: 300 iMay 9, 2022_ <br />Days or dates <br />Net changes from previous Change Orders <br />Net change from previous Change Orders <br />$ JA <br />N/A days <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />Substantial Completion: July 8 2022 <br />$ 992.100 <br />Ready for final payment: ____August 7, 2022 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ j211,4651 <br />118 <br />days <br />Contract Price with all approved Change Orders <br />Contract Time with all approved Change Orders <br />Substantial Completion: 388 <br />$ 780,635 <br />Ready for final payment: 418 <br />Days or dates <br />RECOMMENDED: <br />Enginee (Auth rized Signature) <br />Jill Grimaldi, Kimley-Horn and Associates <br />Date: 2/24/2022 <br />APPROVED: <br />By: <br />Owner (Authorized Signature) <br />Date: <br />ACCEPTED: <br />By: <br />Contractor (Authorized Sig ature) <br />Dave Webb, Jr. All Webbs, Inc. <br />Date: _2 t - � 20 2. <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.