Laserfiche WebLink
• <br />Consent Agenda <br />BCC Meeting March 8, 2022 <br />INDIAN RIVER COUNTY, FLORIDA <br />AGENDA ITEM <br />Assistant County Administrator / <br />fi'`roaN* Departure®t of General Services <br />Parks and Recreation <br />Date: March 2, 2022 <br />To: The Honorable Board of County Commissioners <br />Through: Jason E. Brown, County Administrator <br />Michael C. Zito, Assistant County Administrator <br />Kristin Daniels, Director, Office of Management and Budget <br />Jennifer Hyde, Purchasing Manager <br />From: Kevin M. Kirwin, Director, Parks and Recreation <br />Subject: Authorizing the Purchase Order No. 92697-00, Increase for the Renovation of <br />the Myrtha Skin Liner at the North County Aquatic Center by A and W <br />Flooring Inc. <br />BACKGROUND <br />The North County Aquatic Center (NCAC) was constructed in 2001 — 2002 and the competition <br />pool that was installed at the facility is a Myrtha Pools USA Inc. system which is a stainless-steel <br />modular panel structure lined with a Myrtha Skin that creates the waterproof liner of the pool. <br />The liner of the competition pool at the NCAC must be replaced. The current liner has a temporary <br />patch with wrapped steel plates holding a large area of the liner in place. The warranty period for a <br />Myrtha Skin liner is 10 years from the completion of installation. The liner of the NCAC is 20 <br />years old and has exceeded its projected lifecycle and this condition is beyond a permanent repair. <br />Myrtha Pools has designated A and W Flcoring, Inc. as the only authorized liner repair and <br />replacement contractor in our region. <br />On February 1, 2022 the Board authorized a Waiver of Bid for the issuing of a purchase order to A <br />and W Flooring Inc. to install the Myrtha Skin Liner at the NCAC. A and W Flooring Inc. is <br />required to provide the County a Performance Bond to cover the dewatering and installation of the <br />Myrtha Liner. The cost of the performance bond and value of the requested increase to Purchase <br />Order No. 92697-00 is $8,573.94. <br />FUNDING: <br />The cost of this project is comprised of two main elements, dewatering ($70,300) and pool <br />repairs/liner replacement ($285,798), for a total project cost of $356,098. Funding for this project <br />was included in the 5 Year Capital Improvements Program and the Capital Improvements Element <br />of the Comprehensive Plan for FY 2021/22-2025/26. Funds were budgeted in the amount of <br />$400,000 in the Optional Sales Tax/NCAC. NCAC Pool Liner Replacement account, number <br />31510472-066510-22008. <br />59 <br />