Laserfiche WebLink
03/08/2022 <br />Sector 7 (IRC -1926) Beach and Dune <br />Restoration Project <br />asement Status and Project Recommendation <br />Public Works Department <br />_ Coastal Engineering Division <br />F <br />March 8th, 2022 <br />2.� <br />\LORtp� <br />Sector 7 Background <br />Considered critically eroded by the Florida <br />Department of Environmental Protection. <br />• Lost an average of 1.5 feet/year of <br />beach between 2013 and 2019 <br />14 neighborhoods with 82 properties in <br />total <br />First nourished in 2007 following <br />Hurricanes Frances and Jeanne in 2004 <br />• The County placed 362,000 cy of <br />sand fill <br />7O,-1 <br />