My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-070A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-070A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 1:30:28 PM
Creation date
5/12/2022 11:02:18 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC gWDD <br />Blower and Fla 7� Upgrad- <br />Wm" <br />Table 1: Landfill Gas Properties for Blower <br />and Flare Upgrades <br />T <br />Item <br />Description <br />Unit <br />Quantity <br />Total Price <br />Price <br />Two blowers will be installed initially with ability <br />to add a third in the future. The second skid will be <br />for the aftercooler. Skid sizes are approximately <br />12'X24' and 12'X30'. <br />3 <br />Aftercooler: Aftercooler will a model 93BZF from <br />AXH Air -Coolers (or comparable). Equipped with a <br />20 hp motor. <br />• Hail guard can be added for additional <br />$1,900. <br />• Shipping protection of tube bundle with <br />plywood can be added for $800 (not <br />required if hail guard is installed.) <br />4 <br />Meters: Includes three Rosemount Compact <br />Conditioning meters. Individual meters would be <br />installed on each pipeline that would go to the <br />two end users and one meter would be for the <br />flared gas. <br />5 <br />Flare: Candle stick flare capable of handling full <br />design flow. Manufactured by Perennial or <br />comparable. <br />6 <br />Misc: Piping on skid will be 304 stainless steel and <br />will include recirculation line for added turndown. <br />PLC will be Allen Bradley Compact Logix. All <br />necessary interconnecting piping, spools, valves <br />and flanges included. System will include inlet and <br />outlet knock -out pots. <br />7 <br />Commissioning: Price includes five days of <br />commissioning time for one person (including <br />travel). <br />8 <br />Freight (estimate) — charged at cost plus 15% <br />$18,000 <br />9 <br />TOTAL <br />$789,000 <br />4.0 SHIPMENT <br />Delivery schedule is estimated 37 weeks. This is based on two weeks for procurement cycle and <br />three weeks for finalization of drawings which is in the 37 -week window. <br />5.0 EXCLUSIONS <br />The following items are excluded from this scope of work. <br />1) Any items or works that are not stated or clearly identified in this document. <br />BIOGAS ENGINEERING <br />Page 4 of 5 <br />+1 (562) 786-5656 <br />
The URL can be used to link to this page
Your browser does not support the video tag.