My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/22/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
06/22/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 1:33:06 PM
Creation date
5/31/2022 12:20:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/22/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Departmental Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: June 10, 2021 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, PE, Utilities Engineer <br />Subject: Amendment 1 to Work Order No. 3 for Bowman Consulting Group, Ltd., West Wabasso <br />Septic to Sewer Phase 3 <br />Background: <br />On February 2, 2021 the Board of County Commissioners (BCC) approved Work Order (WO) 3 for Bowman <br />Consulting Group, Ltd. (Bowman) for professional services related to the design of the West Wabasso <br />Septic to Sewer (S2S) Phase 3 project. Indian River County Department of Utility Services (IRCDUS) staff <br />recently added to the project the installation of gravity sewer along 63rd Avenue and 87th Street to <br />connect to an existing County sanitary lift station. <br />The West Wabasso S2S Phase 3 project will now be comprised of three (3) geographically separate areas <br />divided into Phase 3A (along 61St Drive), Phase 3B (59th Avenue and 58th Court), and now Phase 3C (63 d <br />Avenue and 87th Street — See Attachment 1: Location Map). <br />Analysis: <br />The BCC approved the Continuing Consulting Engineering Services Agreement for Professional Services <br />with Bowman on April 17, 2018. In accordance with that agreement, Bowman will provide professional <br />services as described in their Amendment 1 to WO 3 (attached), to prepare engineering design plans and <br />specifications, and apply for required permits. <br />Note: Work Order 3 for Bowman pre -dates the May 18, 2021, extension of the Continuing Contract <br />Agreement for Professional services. Amendment 1 will therefore meet the terms of the original <br />agreement with Bowman. <br />Bowman's fees for Amendment 1 will increase WO 3 by $70,298.00 to a total of $225,860.00. The <br />construction cost is estimated to be $2,482,000.00. <br />The revised estimated costs of the project are as follows: <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.