My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/22/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
06/22/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 1:33:06 PM
Creation date
5/31/2022 12:20:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/22/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/2/21 <br />Estimated Staff Loading For: <br />Indian River Co. Utilities - West Wabasso Septic to Sewer_Phase3C <br />TASK 3r Proj Mg Sr Engr Proj Engr Engr Sr Dsgnr Clerical TOTAL <br />Task 3 - Bidding Services 0 <br />0 <br />1. Respond to RFIs 1 2 2 2 7 <br />2. Assist with Addenda 1 1 3 3 8 <br />3. Attend Pre -Bid Meeting included 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Staff By Category Totals 2 3 5 0 5 0 15 <br />Billing Rate ($/hr) $165 $150 $130 $100 $105 $50 <br />Total Personnel Cost ($) $330 $450 $650 $0 $525 $0 $1,955 <br />Staffing Ratio (% of total hrs) 13.3 20.0 33.3 0.0 33.3 0.0 <br />Average Personnel Cost ($/hr) 130.33 <br />Description of Other Project Costs VALUE ($) <br />Total of other costs ($) $0 <br />Total Estimated Project Cost $1,955 <br />West Wabasso Fee Est. P3C.xls 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.