My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/22/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
06/22/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 1:33:06 PM
Creation date
5/31/2022 12:20:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/22/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWDD Item <br />Indian River County, Florida 166", <br />Solid Waste Disposal District <br />Board Memorandum <br />Date: June 14, 2021 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: Himanshu H. Mehta, PE, Managing Director, Solid Waste Disposal District <br />Subject: Approval for Rehabilitation of the Above Ground Storage Tank at the IRC Landfill <br />Descriptions and Conditions: <br />On May 18, 2021, the Indian River County (IRC) Solid Waste Disposal District (SWDD) Board authorized Work <br />Order No. 42 to Kimley-Horn and Associates (KHA;t for engineering and permitting services to for the centrate <br />to leachate tank conversion project. The purpose of this project is to utilize and repurpose the existing 0.5 - <br />million -gallon above ground storage tank (AGST) for the future leachate treatment project. <br />KHA has provided the attached memorandum recommending that SWDD proceed with a sole -source contract <br />with Crom Corporation (Crom), the original manufacturer of the tank to coat the interior tank walls and bottom <br />as well as to core the tank for the future installation of an external mixing system to keep the leachate mixed <br />during storage. An option is also included for the coating of the interior dome. The coating is needed due to the <br />corrosive nature of leachate. Per KHA, it is imperat°ve that this work be performed by the tank manufacturer to <br />reduce the risk of damaging the pre -stressing rings that span the circumference of the tank. <br />The purpose of this agenda item is for the SWDD Board to approve a sole -source contract to Crom for the <br />rehabilitation of the existing AGST. <br />Analysis: <br />Per KHA, the not -to -exceed authorization to Crom should consist of the following items: <br />Task <br />SCOPE <br />AMOUNT <br />Base Services <br />Mobilization, Tank Insp=ction, Surface Preparation, <br />$ 140,750 <br />Resurfacing, Coating Applications and Disinfection <br />Option 1 <br />Interior Dome Coating: Surface Preparation, Resurfacing and <br />$ 56,525 <br />Coating Applications <br />Option 2 <br />Interior Piping: Surface Preparation and Coating Application <br />$ 5,425 <br />Option 3 <br />Wall Penetration: Four (4) 8 -inch Stainless Steel, wall pipes <br />$ 50,000 <br />TOTAL FEE = <br />$ 252,700 <br />SWDD Agenda - Rehabilitation of the Above Ground Storage Tan4: at the IRC Landfill Page JNJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.